Interstate 57 Add lane from I-24 to I-64. Add the 3 rd lane to Interstate 57. From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per day @ 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck Traffic = 30% or 10,000 Trucks per day

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - Albert_Lan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Interstate 57 add lane from i 24 to i 64 l.jpg

Interstate 57 Add lane from I-24 to I-64


Add the 3 rd lane to interstate 57 l.jpg
Add the 3rd lane to Interstate 57

  • From I-24 (MP 44) to I-64 (MP 92) is 48 miles

  • ADT

    • 2009 ADT = 30,000 vehicles per day

    • @ 2.2% growth rate 2030 ADT = 48,000 vpd

    • 2009 Average Daily Truck Traffic = 30% or 10,000 Trucks per day

  • Estimated Cost to Widen to 6 lanes = $350 M (does not include rehabilitation of the exist. Pavement)


Slide3 l.jpg

IDOT conducted a Feasibility Study in Franklin County to investigate adding the 3rd lane to I-57


Feasibility study in franklin county conclusions l.jpg
Feasibility Study in Franklin County Conclusions investigate adding the 3

  • Yes, the I-57 traffic warrants an additional lane

  • Widening should be accomplished by widening to the inside:

    • minimizes right of way cost and impacts

    • includes closed drainage where median is less than 64’

    • requires widening of bridges

    • does not impact overhead structures and interchanges

  • Costs (excludes structures & rehabilitation of the existing pavement)

    • Inside Alternate (50’ existing median): $890/ft

    • Inside Alternate (64’ existing median): $1,030/ft

    • Inside Alternate (80’ existing median): $790/ft


  • Slide5 l.jpg

    Typical Sections : Inside Widening with 64’ median (closed drainage in median)

    Typical Sections : Inside Widening with 80’ median (open drainage in median)


    Photo rendering adding 3 rd lane to the inside with barrier wall l.jpg
    Photo Rendering – Adding 3 drainage in medianrd lane to the inside with barrier wall


    Photo rendering adding 3 rd lane to the inside with barrier wall7 l.jpg
    Photo Rendering – Adding 3 drainage in medianrd lane to the inside with barrier wall



    Historical annual programs 2002 2010 published book state only l.jpg
    HISTORICAL ANNUAL PROGRAMS drainage in median2002 – 2010 PUBLISHED BOOK – STATE ONLY

    INCLUDES: FED. STIMULUS AND 2009 JUMP START PROJECTS


    How can we accomplish l.jpg
    How can we accomplish? drainage in median

    • When replacing I- 57 Structures add the 3rd lane … Underway

    • Rehabilitate I- 57 Pavement ….Underway

    • Begin design work on small fundable contracts to add the third lane, begin to introduce into the program or have ready for new funding initiatives ….Underway


    1 when replacing i 57 structures add the 3 rd lane underway l.jpg
    #1. drainage in medianWhen replacing I- 57 Structures add the 3rd lane … Underway

    • Bridges completed that accommodate 3 lanes

      • MP 51, I-57 over Crab Orchard Creek (S of Marion)

      • MP 53, I-57 over old IL 13 in Marion

      • MP 53, I-57 over the Crab Orchard and Egyptian RR

      • MP 59, I-57 over Lake Creek (S of Johnston City)

      • MP 90, I-57 over Casey Fork Creek (S of Mt. Vernon)

    • Bridges in the program that will be built and will accommodate 3 lanes

      • MP 54, I-57 over new IL 13

      • MP 65, I-57 over 7th Street in West Frankfort

      • MP 71, I-57 over the UP Railroad


    Slide12 l.jpg

    PROJECT LOCATION ON INTERSTATE 57 IN drainage in medianFRANKLIN COUNTY

    REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER 7TH ST. AND THE ABANDONED C&EI RAILROAD.

    LOCATED 0.7 MILES NORTH OF IL. RTE. 149

    June 11, 2010 Letting


    Slide13 l.jpg

    PROJECT LOCATION ON INTERSTATE 57 IN FRANKLIN COUNTY drainage in median

    REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER THE UNION PACIFIC RAILROAD.

    LOCATED 1.1 MILES SOUTH OF IL. RTE. 14 IN BENTON

    September 17, 2010 letting

    (pending ruling by IL commerce commission)


    2 rehabilitate i 57 pavement underway and near completion l.jpg
    2. Rehabilitate I- 57 Pavement …. drainage in medianUnderway and near completion

    • Complete – I-57 NB IL 13 to Williamson/Franklin Co. Line

    • Complete – I-57 NB & SB IL 14 to Franklin Co. Line

    • Rubblization of I-57 will be complete in 2011 from IL 13 (Marion) to 1 mile north of Bonnie (south of Mt. Vernon)


    Upcoming i 57 rubblization contracts l.jpg
    Upcoming I-57 Rubblization Contracts drainage in median

    • I-57 Rubblization in Williamson and Franklin County, 2nd Federal Stimulus (“Jobs for Main St. Act”:

      • NB – Williamson/Franklin County line to IL 14

      • SB – IL 14 to north of IL 13

      • NB – 9.9 miles

      • SB – 16.2 miles

      • Estimated Cost - $32.7 M

      • Summer 2010 - work should begin in May and be complete in September

      • Lane closures and delays expected


    Upcoming i 57 rubblization contracts16 l.jpg
    Upcoming I-57 Rubblization Contracts drainage in median

    • I-57 Rubblization in Jefferson County, Construction Now program:

      • NB & SB - from the Franklin County line to 1 mile north of Bonnie

      • 6.6 miles

      • Estimated Cost - $15.8

      • Work in late 2010 and 2011

      • Work may begin in September, 2010 and be completed by July 1, 2011

      • Lane closures and delays expected


    Slide17 l.jpg

    RUBBLIZATION EQUIPMENT drainage in median


    3 add 3 rd lane to i 57 in fundable usable segments contracts l.jpg
    3. Add 3 drainage in medianrd lane to I- 57 in fundable, usable segments/contracts….

    • 3rd Lane Complete – Marion; South of MP 53 to north of MP 53- (not open to traffic)

    • Funded in MYP- MP 92, I-64 south of Mt. Vernon, to MP 96, I-64 north of Mt. Vernon; design under way to add third lane and replace the pavement. Construction planned for 2011.

    • Funded in MYP - MP 54 Marion, design underway to complete the 3rd lane through Marion


    Add 3 rd lane to i 57 in fundable usable segments contracts l.jpg
    Add 3 drainage in medianrd lane to I- 57 in fundable, usable segments/contracts

    • Unfunded ---- 1st priority: add third lane for 12.7 miles from north of IL 13 in Williamson County to south the Middle Fork Big Muddy River in Franklin County (north of Benton)

    • Total Cost = $65 M

      • 12.7 miles of 3rd lane = $56 M

      • I-57 over Pond Creek, SN 028-0001&0002, replacement, $6.0 M

      • I-57 over Lake Creek Branch, SN 100-0010 & 0011, widen structure and superstructure replacement, $3.0 M


    Slide20 l.jpg
    Or drainage in median

    • Unfunded – 2nd choice: add third lane for 8 miles from north of IL 13 in Williamson County to the Williamson / Franklin County Line

    • Total Cost = $36.5 M

      • 8 miles of 3rd lane (80’ median, open drainage) = $33.5 M

      • I-57 over Lake Creek Branch, SN 100-0010 & 0011, widen structure and superstructure replacement, $3.0 M

      • May be ready for a September, 2010 letting


    Job supported by highway investments l.jpg
    Job Supported by Highway Investments drainage in median

    • The Federal Highway Administration (FHWA) estimates that a $1 billion of Federal highway expenditure supports 30,000 jobs which includes direct, supporting, and induced positions, defined as:

      • Construction oriented employment, includes all jobs created by the construction firms that work directly on the project or by the firms that provide direct inputs (paving materials, steel, concrete, etc.) to the construction project;

      • Supporting industries' employment, includes jobs in firms that provide inputs to the industries that directly provide materials and equipment used in highway construction. For example, a firm that produces guard rails is counted as 'construction oriented' employment but the firm that provides the sheet steel to make the guard rails is considered part of 'supporting industries' employment; and

      • Induced employment, includes all of the jobs supported by consumer expenditures resulting from wages to 'construction oriented' and 'supporting industries' employment.


    Job supported by highway investments22 l.jpg
    Job Supported by Highway Investments drainage in median

    • $1 billion of Federal-aid expenditure supported:

      • 10,300 construction oriented jobs;

      • 4,600 supporting industries' jobs;

      • and 15,000 induced employment jobs

    • $350 M in highway expenditures, according to FHWA, should translate into:

      • 3600 construction oriented jobs;

      • 1600 supporting industries' jobs;

      • and 5250 induced employment jobs


    Idot myp public meeting l.jpg
    IDOT MYP Public drainage in medianMeeting

    • Tuesday, January 26, 2010, from 4:00 p.m.to 6:00 p.m. at the Williamson County Pavilion, 1602 Sioux Drive, Marion, IL

    • IDOT is seeking additional public feedback on development of its proposed Multi-Year Program for Highway Improvements


    Slide24 l.jpg

    IDOT’S WEBSITE drainage in median

    www.dot.il.gov