An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Digitar project (Digitalization of the Archives)

  2. B-Telecom seminar october 9 • The three phases of the project • Some milestones • Terminal replacement • Scanning of “New documents” (C9) • Scanning of the existing files (C1) • The network : before & after • The “Disaster Recovery” solution

  3. The three phases of the project • Phase 1 : • Replacement of the network and existing terminals • Phase 2 : • Digitalisation, with the same “force probante”, of the documents entering daily in the Branches (=BC) (C9 documents = “new documents”) … • Phase 3 : • Scanning of the existing files (C1 documents) • Replace paper files by digitalized files

  4. Terminal replacement • More than 1.800 “secured” workstations (PC) • Used for : • access to mainframe applications via terminal emulation • ONEm Intranet • viewing of the digitalized files C9 - C1 • Workstations : Dell GX240 - PIV - 1.000 Mhz (en more …) - 256 MB - “Small Form Factor” • Access to mainframe applications via a simple Browser (Internet Explorer) and “Active/X” component

  5. Terminal replacement • Choice : TFT flat screens • Two categories of users : • unfrequent imaging users (+- 2/3) : Philips 15” screens • frequent users of imaging (+- 1/3) : Philips 18” screens

  6. Scanning of new documents • Volumes : (2.300.000 + 460.000) * 6 = 16,5 millions pages/year • 1 page = +- 50 Kbytes, so more than 800 Gbytes per year • Images scanned and controlled in the branches • Background transfer of images to the Central Administration (AC) via the network • All images stored centrally (Jukeboxes) and sent to workstations on demand

  7. Recovery of existing classifications • Volumes : • more than 2.066.000 “active” files • mean of 50 pages (images) per file = 103.325.000 images • 1 image = +- 50 Kbytes, so total volume of about 5 Terabytes (x 2 in DRC) • Decentralised scanning in all Branches • Spread over 3 years • 2 archiving lines at AC (+ 2 at Disaster Recovery Center)

  8. The network before Digitar Fonds de fermeture des Entreprises - Sluitingsfonds voor Ondernemingen AC HB CP 2000 CP 2000 CP 2000 CP 2000 CP 2000 BC WB

  9. The network before Digitar Mainframe Bureautics AC “Datamizer” (Data compression) Backup & Overflow ISDN Leased line 19.2 K “Datamizer” BC Bureautique CP 2000

  10. Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  11. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  12. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  13. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  14. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  15. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  16. System Server Windows 2000 Parallel installation NT Servers System - Applic CP 2000 Datamizer Router CP 2000

  17. System Server Windows 2000 Parallel installation NT Servers System - Applic Evolution towards a common environment ...

  18. A common network Mainframe Intranet Server Imaging Servers (DIGITAR) Image (Cache) Bureautics Jukeboxes + Drivers AC Router CISCO Catalyst 6009 2 Mbits line ISDN System Server Router CISCO 2611 BC Bureautics Terminal Emulation + Image

  19. Mainframe + Digitar Digitar Network Redundancy To the branches A.C. B-Telecom Bxl Nord DRC Anvers Ring S.D.H. 30 x 2 + 1 x 34 Mbits/sec DRC Antwerpen H.B. B-Telecom Bxl Midi To the branches

  20. 34 Mbits Disaster Recovery Anvers - Antwerpen AC - HB 30 x 2 Mbits B-Telecom Réserve +-75% Serveurs Disaster Recovery Mainframe WB - BC

  21. 34 Mbits Disaster Recovery Anvers - Antwerpen AC - HB 30 x 2 Mbits B-Telecom Réserve +-75% Serveurs Disaster Recovery Mainframe WB - BC

  22. 34 Mbits Disaster Recovery Anvers - Antwerpen AC - HB 30 x 2 Mbits B-Telecom Reserve +-75% Servers Disaster Recovery Mainframe WB - BC

  23. Disaster Recovery Anvers - Antwerpen AC - HB 30 x 2 Mbits B-Telecom Disaster Recovery Mainframe WB - BC

  24. Disaster Recovery Anvers - Antwerpen AC - HB 30 x 2 Mbits ISDN 6 x 128 Kbits B-Telecom Disaster Recovery Mainframe WB - BC

  25. monITio Consult monITio @ pandora.be