FT Status and Plans. Overall CTS Worked to get CTS back on line Slots A4-7 have problems Had to work on SBC Don L. is continuing tests with new VRBC and VRB firmware at CTS L1 Deadtime – Extra Data in readout Put 470KOhm 0402 resistors on un-used channels 8 per MCM, 64 per board

Download Presentation

FT Status and Plans

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ft status and plans

FT Status and Plans

  • Overall

    • CTS

      • Worked to get CTS back on line

        • Slots A4-7 have problems

        • Had to work on SBC

      • Don L. is continuing tests with new VRBC and VRB firmware at CTS

    • L1 Deadtime – Extra Data in readout

      • Put 470KOhm 0402 resistors on un-used channels

      • 8 per MCM, 64 per board

      • Verify << in process now

        • Board ready for platform

      • Set up modification line

  • Access AFE board swap

    • CFT

      • Replaced 9A5 >> dip at X2

      • Replaced 7A4

        • Inductors to look at double peds

    • CPS

      • Re-programmed CPSS personality

    • FPS

    • CTT

6 Mayl 2003


July shutdown

July Shutdown

  • General items being considered

    • Cryostat work

      • About 1 degK left in setting

      • Have been moving about 0.1

      • Will not warm up “unless” have further problems

    • Cassette work

      • Only if we warm up

      • Perhaps install ‘testing’ cassette

    • Will do

      • Unused channel fix for AFE brds

      • Check/calibrate/fix AFE lvps monitoring

      • Add SEQ crate monitoring

      • Finish LED pulser boards and cabling

      • New firmware

      • Fix slot problems – AFE & SEQ

        • 4B6 SVX Downloads

        • 6B2/3 SEQ signals @ SEQ BP

    • May do

      • AC remote shutoff for AFE lvps

      • 53MHz readout

      • Re-cable back of SEQ crate PC04

    • Will not do

  • CPS

  • FPS

  • CTT

  • FPD

Starts ~July 28 >> 4 to 6 weeks

6 Mayl 2003


July shutdown 2

July Shutdown 2

  • Details

    • How long to do?

    • Who can work on?

    • When can it be done?

Starts ~July 28 >> 4 to 6 weeks

6 Mayl 2003


Merge shifts

Merge Shifts

  • Management has scheduled a merger of CFT and SMT shifts

    • Would start after shutdown

      • after MUON and CAL merge

        • Should be merged by end June

  • Can the shifts be merged

    • Reduce the amount of work the CFT shifter does

    • Increase effectiveness per minute of attention

    • Improve and condense the documentation

  • How are shifts merged

    • Need people from both groups with cross knowledge

    • Need a small core of people to get it done

6 Mayl 2003