Extended Reach Drilling. Impact - UK Southern Gas Basin. Cost Savings = $70 million 1 less well - $12 million Lower drilling cost - $18 million One platform instead of two - $40 million Increased Reserves Tristan: 34 BCF developed from Welland Field

Download Presentation

Extended Reach Drilling

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Extended reach drilling

Extended Reach Drilling

Impact - UK Southern Gas Basin

  • Cost Savings = $70 million

  • 1 less well - $12 million

  • Lower drilling cost - $18 million

  • One platform instead of two - $40 million

  • Increased Reserves

  • Tristan: 34 BCF developed from Welland Field

  • Cador: 20 BCF developed from Camelot Field