ATP
This presentation is the property of its rightful owner.
Sponsored Links
1 / 17

ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment PowerPoint PPT Presentation


  • 94 Views
  • Uploaded on
  • Presentation posted in: General

ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage.

Download Presentation

ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Atp annex 1 appendix 2 49 b mechanically refrigerated equipment

ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage


Atp annex 1 appendix 2 49 b mechanically refrigerated equipment

“It shall be verified that, when the outside temperature is not lower than + 15 oC, the inside temperature of the empty equipment, which has been previously brought to the outside temperature, can be brought within a maximum period of 6 hours.”

ATPAnnex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment


Un wp 11 trans wp 11 2004 9 29 july 2004

“It shall be… , …can be brought within a maximum period as described in the following table in the case of equipment in classes A, B, or C, to the minimum temperature, as prescribed in this table:”

UNWP.11TRANS/WP.11/2004/929 JULY 2004


Un wp 11 trans wp 11 2004 9 29 july 20041

UNWP.11TRANS/WP.11/2004/929 JULY 2004

Mean outside temperature


Evaluation of annual atp inspections due to new criterias

Inspections carried out through 2001 – 2005

Evaluation with shorter cool-down time

According to TRANS.WP11/2004/9

Statistics is presented in diagrams

Number of passed / failed and total number of evaluated equipments

Fraction of passed / failed and total number of evaluated equipments

Evaluation of annual ATP-inspectionsdue to new criterias


Manufacturer

BODIES 13

THERMAL EQUIPMENT 4

MANUFACTURER


Number of passed failed of total number tested 233 units

Number of passed /failed of total number tested (233 units)


Number of passed failed of total number tested 233 units1

Number of passed /failed of total number tested (233 units)


Number of failed of total number tested 233 units

Number of failed of total number tested (233 units)


Number of passed of total number tested 233 units

Number of passed of total number tested (233 units)


Number of passed failed of total number tested 233 units2

Number of passed /failed of total number tested (233 units)


Fraction of passed failed of total number tested 233 units

Fraction of passed /failed of total number tested (233 units)


Fraction of passed failed of total number tested 233 units1

Fraction of passed /failed of total number tested (233 units)


Fraction of failed of total number tested 233 units

Fraction of failed of total number tested (233 units)


Fraction of passed of total number tested 233 units

Fraction of passed of total number tested (233 units)


Fraction of passed failed of total number tested 233 units2

Fraction of passed /failed of total number tested (233 units)


  • Login