ATP
Download
1 / 17

ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment - PowerPoint PPT Presentation


  • 142 Views
  • Uploaded on

ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ATP Annex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment' - zlhna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ATP Agreement on the International Carriage of Perishable Foodstuffs and on the Special Equipment to be used for such Carriage


Atp annex 1 appendix 2 49 b mechanically refrigerated equipment

“It shall be verified that, when the outside temperature is not lower than + 15 oC, the inside temperature of the empty equipment, which has been previously brought to the outside temperature, can be brought within a maximum period of 6 hours.”

ATPAnnex 1, Appendix 2 § [49 (b)] Mechanically refrigerated equipment


Un wp 11 trans wp 11 2004 9 29 july 2004

“It shall be… , …can be brought within a maximum period as described in the following table in the case of equipment in classes A, B, or C, to the minimum temperature, as prescribed in this table:”

UNWP.11TRANS/WP.11/2004/929 JULY 2004


Un wp 11 trans wp 11 2004 9 29 july 20041
UN period WP.11TRANS/WP.11/2004/929 JULY 2004

Mean outside temperature


Evaluation of annual atp inspections due to new criterias

Inspections carried out through 2001 – 2005 period

Evaluation with shorter cool-down time

According to TRANS.WP11/2004/9

Statistics is presented in diagrams

Number of passed / failed and total number of evaluated equipments

Fraction of passed / failed and total number of evaluated equipments

Evaluation of annual ATP-inspectionsdue to new criterias


Manufacturer

BODIES 13 period

THERMAL EQUIPMENT 4

MANUFACTURER












ad