exchange project 2013
Download
Skip this Video
Download Presentation
Exchange project 2013

Loading in 2 Seconds...

play fullscreen
1 / 7

Exchange project 2013 - PowerPoint PPT Presentation


  • 77 Views
  • Uploaded on

Exchange project 2013. Install and configure Microsoft server 2008R2 [email protected] Basic setting:. The Transport company 10C needs a new IT infrastructure. Headquarters in Son Second location Zary Poland The two locations are Connected via VPN.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Exchange project 2013' - ziazan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
exchange project 2013

Exchange project 2013

Install and configure Microsoft server 2008R2

[email protected]

basic setting
Basic setting:
  • The Transport company 10C needs a new IT infrastructure.
    • Headquarters in Son
    • Second location Zary Poland
  • The two locations are Connected via VPN.
  • The company would like an Own mail server in Holland and a SharePoint (Foundation) server
vision client first
Vision: Client First
  •   Customer satisfaction, this is where it’s all about at 10C. That also applies for partnership. No short- term investments but long-established relationships. Thus we are proud to have the opportunity to work for leading companies around the world.
  • 10C has its origin in a family company in southern Netherlands, established in 1923. Decisive and with a pleasant atmosphere and informal culture.
  • The Name 10C is based on the fact that it was the first company to have a trailer for 10 cows.
deliverables
Deliverables
  • 1. Plan for the next 3 weeks
  • 2. Functional design
  • 3. Technical design
  • 4. Implementation and test
  • 5. Presentation of the project.
company overview
Company overview

Holland Poland

  • CEO:                     D. Doc M. Mędrek
  • HRM                       G. Giechel W. Wesołek
  • CFO:     G. Grumpie G. Gburek
  • Sales             D. Dommel S. Śpioszek
  • Warehouse           N. Niezel A. Apsik
  • ICT Bashful  B. Bloosje N. Nieśmiałek
  • Logistics        S. StoetelG. Gapcio
  • Development W. Wortel
specific requirements
Specific requirements:
  • Implement A/D all users except Development can log-in everywhere.
  • Development has personalized computers
  • Automatic language switch based on user
  • Automatics background switch based one language and location
ad