An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHANTI status F.A., C. Annunziatella*, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra**, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi «Federico II» e Sezione INFN -Napoli *B.Sc. Thesis work **Master Thesis work

  2. Detailed G4 simulation • A detailedsimulation of the bar hasbeenwritten in G4,taking into account allopticalprocesses, includingabsorption and reemission inside the BCF-92 fiber

  3. Optical interfaces • There are variousopticalinterfaces to describe: TiO2 coating-Sci, Sci-Glue; Glue-Clad, Clad-Core, Fiber end (mirrored). All of themincludedinto the simulation. 10000 opticalphotons

  4. Optical interfaces (2) • Core-Cladding Reflection Refraction

  5. Optical interfaces (3) • Lambert diffusion on scintillator-coatinginterface

  6. Muons • Muonssimulatedaccording to the angulardistributionobtained in the cosmicraytelescopeused to characterize the bars. Reasonableagreement with observeddistribution of Npe MC ≈40% PDEDATA

  7. MC: nextsteps • Use the full simulation to obtain a time correction for xy position on techrun data • Parametrize the opticalresponse (aswealreadydid for the LAV blocks) and put thisdetaileddescription in official MC • Complete the digitization <v>=19,6 cm/ns

  8. Construction/test status (1) • Long stop (from Decembertillnow…) in bar tests due to a serious fault in climaticchamber (nowsolved, restarting) • Half of the bar tested . Expect 6 monthstime to complete tests on allbars. R Npe

  9. Construction/test status 2 • Design of the main vessel (CHANTI1-5) completed • 3D mockup of the insertionregiongiven to GTK group so thatthey can cope to our design whencompleting the mechanical design of the GTK • Construction in progress (80% complete) in Napoli workshop w material (AISI 304L steelplates) bought by UCLouvain

  10. Conclusions • Detailed MC prepared, nextstepiscomparison with techrun data • Very big work from mechanical workshop and mechanical designer in Napoli to build the CHANTI-GTK3 vessel->almost ready • Quality test on barsrestartedafter a long stop