GRCC Program – Current Status

GRCC Program – Current Status. Upper North Fork and Ranchland Sediment Source Inventories. Instream and Upslope Sites identified Nearly 700,000 cubic yards sediment savings – mostly stabilizing the toe of landslides Equals approximately 60% of human induced sediment estimated by TMDL.

zeno
Download Presentation

GRCC Program – Current Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRCC Program – Current Status

  2. Upper North Fork and Ranchland Sediment Source Inventories • Instream and Upslope Sites identified • Nearly 700,000 cubic yards sediment savings – mostly stabilizing the toe of landslides • Equals approximately 60% of human induced sediment estimated by TMDL

  3. Project Status • Between ranches and Humboldt Redwood Company, MRC gained access to nearly 100% of class I watercourses • Applied for funding with DFG and SWRCB • We hope to perform implementation project in the Summer 2010

  4. Benda’s North Fork Study Positive feedback: channel aggradation – undercutting slopes

  5. Oil Creek

  6. Devil’s Creek

  7. Upper North Fork

  8. Upper North Fork at Honeydew

  9. Benda’s Graphics

  10. More Benda Diagrams: In my opinion this is where instream restoration can be most effective

  11. 2009 GRCC implementation season plan • It is our hope to finish Blue Slide to Grindstone and Bear Creek Project Areas • Many instream sites that address lateral migration and downcutting depicted in Benda’s diagram • Also complete instream site on mainstem Mattole at Groelings (Petrolia Project Area)

  12. 2009 Implementation Planning • Project planning and landowner contact underway • Definitely some unknowns with frozen funds and cash flow issues, though GRCC program is still well funded federally • Downsizing a bit from last year • Using only 5 contractors

  13. GRCC efforts to integrate restoration activities • We recognize the importance of collaboration with other MRC programs as well as SFI and MSG • Examples: • UNF project integrates GRCC, Riparian Ecosystem Restoration, Instream Habitat and Monitoring • Sediment reduction projects also designed for groundwater infiltration • Coordinated monitoring of salmonid presence with turbidity

  14. We need to focus on a “limiting factors approach” for watershed prioritization

More Related