Nsf data management plan requirement
This presentation is the property of its rightful owner.
Sponsored Links
1 / 6

NSF Data Management Plan Requirement PowerPoint PPT Presentation


  • 46 Views
  • Uploaded on
  • Presentation posted in: General

William Mischo & Mary Schlembach. NSF Data Management Plan Requirement. Presentation May 25, 2011. Data Management Plan. The Data Management Plan (DMP) is a new NSF mandatory supplementary document for all research proposals http://www.nsf.gov/bfa/dias/policy/dmp.jsp

Download Presentation

NSF Data Management Plan Requirement

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Nsf data management plan requirement

William Mischo & Mary Schlembach

NSF Data Management Plan Requirement

Presentation

May 25, 2011


Data management plan

Data Management Plan

  • The Data Management Plan (DMP) is a new NSF mandatory supplementary document for all research proposals

    • http://www.nsf.gov/bfa/dias/policy/dmp.jsp

  • Each directorate, including the Engineering Directorate (ENG), has prepared documents providing some specific directions and required elements

  • The ENG document: http://nsf.gov/eng/general/ENG_DMP_Policy.pdf


Date management plan

Date Management Plan

  • “Investigators are expected to share with other researchers, at no more than incremental cost and within a reasonable time, the primary data … created or gathered in the course of work under NSF grants”

  • Maximum of two pages and will not count against the 15 page limit for proposals


Date management plan1

Date Management Plan

  • The basic level of digital data to be archived and made available includes analyzed data (not raw data) and the metadata (descriptive data about the data) that define how these data were generated

  • For Engineering Directorate grants, raw data from sensors or other instruments is not required to be archived


Date management plan2

Date Management Plan

  • Include data that are or should be published in refereed journal articles, and for supplemental data attachments for manuscript, book and book chapters, and other publications

  • Metadata elements include descriptions of experiments, apparatuses, raw materials, computational code, and compute-calculation input conditions


Date management plan3

Date Management Plan

  • NSF assumes that DMP documents will be vetted and standardized through the review process. It is expected that a community of practice will evolve over the next several years

  • We have put together a template document with suggested text to assist proposal preparers in constructing the DMP


  • Login