Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR

Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR. Avinor Organization changes. ANS division of Avinor will in 2014 be established as a separate company owned by Avinor Date will be determined by the Avinor board 27 March 2014

zazu
Download Presentation

Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Avinor update CPWG/16 Ottawa 4-6 December2013Bodo ACC Bodo Oceanic FIR

  2. Avinor Organization changes • ANS division of Avinor will in 2014 be established as a separate company owned by Avinor • Date will be determined by the Avinor board 27 March 2014 • All Avinor ANS employees will be transferred to the new company • Re-organizing the Area Control Centers in Norway • Decision of one ACC unit in Norway was made in 2012 • In September 2013 it was decided to keep the three locations for en- route services, and organize it as one unit. • The goal is increased efficiency through standardization, centralized management, support and training to meet the Single European Sky requirements. • A plan to achieve the goals is to be presented by the end of the year. • After extensive analysis, Avinor management believes this will give the best solution when taking into account economic demands, risk, capacity to execute the change, and to meet external requirements.

  3. Bodo OFIR Norway ACC Bodo ATCC Stavanger ATCC Oslo ATCC

  4. Bodo Oceanic – New ATM system update • Improvements compared to current Oceanic system: • Data-link (CPDLC and ADS-C) service • Oceanic clearance via CPDLC • AIDC/ OLDI capability • Reduces controller workload significantly and increases sector capacity • Status December 2013 • Factory acceptance test September 2013 failed. New FAT week 50-51 2013 • Contract agreed with SITA for data-link communication services • Instructor training completed in Azores October 2013 • Simulator installation planned for January 2014 • Controller training starting in February 2014 • Operational on AIRAC May 29th 2014

  5. Bodo Oceanic – Other developments • Project for replacing old HF transmitter and receiver stations has started. • Three old stations will be replaced by two new installations • Target date for implementation is 30th June 2014. • Project for adding an extra VHF radio has started. • Improved VHF coverage in eastern part of Oceanic airspace along border to Murmansk FIR • Expected to be completed summer 2014.

  6. Bodo Oceanic – VHF Communications • Established new VHF stations for Oceanic use (127,725 Mhz) • Coverage FL300+ 2013 Before 2010

  7. Expected summer 2014

  8. Bodo Oceanic – Radar coverage

  9. LYR/ ENSB

  10. Longyear airport – ENSB • Possible en-route alternate • Published hours of service: H24 • Commercial aircraft operations throughout the year primarily with B737s. • Published Runway dimensions are 2323 X 45m (7,621 X 148 FT ). • ILS RWY 10 / LOC 28 instrument approach procedures • Hotels, restaurants and medical center in Longyear • Contact information and more details in Norwegian AIP at http:// www.ippc.no