What’s New at FAST? 2009 FTC Update. Glenn Grayson, PE Director of FAST. Signal Timing Plan - 2008 Update. 8 square miles in NE quadrant 9 arterials (4 EW and 5 NS) Craig to Nellis to Washington to Las Vegas Blvd 140 intersections

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Glenn Grayson, PE Director of FAST' - zanna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

What’s New at FAST?

2009 FTC Update

Glenn Grayson, PE Director of FAST

signal timing plan 2008 update
Signal Timing Plan - 2008 Update
  • 8 square miles in NE quadrant
      • 9 arterials (4 EW and 5 NS)
        • Craig to Nellis to Washington to Las Vegas Blvd
      • 140 intersections
  • New timing plans (splits, offsets, sequences, but most CL stayed the same)
  • Orth-Rodgers & Associates
      • Under budget + on time => Add’l locations (UNLV)
      • Very high B/C ratio resulting
slide3

 Partnership

  • RTC~NDOT Interlocal Agreement for FAST Services (O&M) extended for…

…four more years!

  • NDOT stipend boosted by $1M / year:
      • Performance Measurement (our new mantra)
      • More freeways equipped with ITS
slide4

 Partnership

  • Ours is a Great Marriage, now past the ‘honeymoon’ period
slide5

Freeway Corridor

Projects Update

Stage I Complete

Stage II Complete

US 95 ITS 98% Complete

Package B

Under Construction

I-15 N. Design-Build

85% Complete

I-15 S. Design-Build

Under Construction

Beltway

Freeway

Management

System

slide6

Fast Text Messaging Subscription

Freeway Traffic Alerts

  • Pilot Program Started Feb. 2009
  • 900 Sign-ups (at www.rtcsnv.com)
sample text message sms
Sample Text Message (SMS)

I-15 NORTH @ MLK EXIT RAMP

CRASH BLOCKING MLK EXIT RAMP

USE OTHER ROUTES

9/4/09 12:52 PM

boulder hwy adaptive system
Boulder Hwy Adaptive System
  • SCATS installed late 2008
      • 10 intersections (8 on Boulder Hwy, plus 2 off)
  • Communication was a challenge
  • Detection reworking was a challenge
  • Not exactly a success (or failure)
      • Before-and-After showed no great improvement
      • Seems to require more maintenance ‘babysitting’
      • No plans to expand SCATS
fast officially joins tmcpfs
FAST officially joins TMCPFS
  • The Pooled-Fund Study concept = State DOTs form a cooperative to conduct applied research
      • Many narrow-focused PFS have been created
      • FHWA administers the program
  • The TMC PFS is focused on needs and practices of Traffic Management Centers
      • RTC-FAST joined as an independent voice in 2009
      • We also hosted this year’s Annual Meeting
continuing to provide services
Continuing to Provide Services
  • To our 4 valued “clients” (signal coord)
      • City of Las Vegas
      • City of Henderson
      • City of North Las Vegas
      • Clark County
  • To our esteemed “partner” (freeway ITS)