- Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road

Loading in 2 Seconds...

play fullscreen
1 / 48

- Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road - PowerPoint PPT Presentation


  • 100 Views
  • Uploaded on

Rajasthan State Road Development & Construction Corporation Ltd. - Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road. BLG Construction Services (P) Ltd. AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY. Project Location. Gotan.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' - Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road' - zamora


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Rajasthan State Road Development

& Construction Corporation Ltd.

- Development of -

Gotan-Pundlu-Borunda-Ransigaon-

Khariameethapur-Bilara-Sojat Road

BLGConstruction Services (P) Ltd

AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY

slide2

Project Location

Gotan

Borunda

Khejarla

Bilara

Sojat

slide3

Project Map

Gotan

Borunda

Khejarla

Bilara

Sojat

slide4

Necessity of The Project

This route Carries Heavy Mining and Industrial Traffic. A large number of lime, cement and chemical Industries nearly more than 100 are situated on this road. Besides this a large number lime stone quarries are also situated in the surroundings of this Road.

The road caters for raw and finished lime product transportation. The area is agriculturally rich and improvement of this road will reduce the operation and maintenance cost of vehicles plying over this road.

slide6

Study Objective

  • Development of the road as two laning with paved shoulder or earthen shoulder.
  • Determining technical feasibility & financial viability.
  • Development & Construction of project highway with project facilities, enhanced safety & Level of services.
  • To ensure minimum adverse impact on local population, road users & environment .
  • Phased development of project highway for improving its financial viability with minimum inconvenience to traffic if additional work are undertaken within 7 years.
slide8

Work Done Till Date

    • Reconnaissance Survey Completed
  • Mobilization of Staff
  • 7 Days Traffic demand assessment and classified Traffic Volume count work completed, Intersection volume count completed, Pedestrian crossing completed. Axle load Spectrum completed.
  • Topographic, Alignment and Land use survey completed for 70km of project road. Bridge & road condition survey completed.
  • Geotech, material, hydrology, drainage survey in progress
  • Inspection of available records completed.
  • Land Plan survey under preparation.
  • Environment and social impact study in progress.
slide11

Project Description

  • Project Road is Road from Gotan to Sojat Via Pundlu – Borunda
  • Project Road is having total length of 93 Kms.
  • Project Road length is 23 KM in district Nagour.
  • Project Road length is 58 KM in district Jodhpur & 12 KM in Pali
slide12

Project Description contd..

Project Road passes through town villages as below :

  • Predominant land use is agriculture.
  • Structures are generally in good condition.
  • Minor bridges and pipe culverts shall have to be reconstructed / widened.
  • Flush Causeways will be replaced by Culverts.
  • Bypass at Ransigaon-Hariadhana and pundlu are proposed.
  • Construction of CC road in Borunda mining area and other water logged village portions.
slide14

Physical Features contd..

  • Formation Width
  • Various from 10 M to 12 M
  • Carriageway Width
  • KM 0/0 – 22/0 5.5 M
  • KM 22/0 – 26/0 Kuccha/Damaged
  • KM 26/0 – 45/0 3.75 M
  • KM 45/0 – 53/0 5.5 M
  • KM 53/0 – 62/0 3.75 M
  • KM 62/0 – 63/0 7 M
  • KM 63/0 – 93/0 5.5 M
  • Crust Thickness
  • WBM - 150 MM
  • GSB - 300 MM to 230 MM
  • B.T. - 20mm PMC
  • CBR
  • 10.0%
slide17

Photos

Starting Point at Gotan

Pipe Culvert

Kacha Track in

Mining Area Borunda

Flush Causeway

Intersection at Dhanapa

slide18

ALIGNMENT THROUGH TOWN/VILLAGES

The alignment passes through village Gotan-Pundlu-Borunda-Hariadhana-Ransigaon-Murkasni-Jhaak-Khariameethapur-Bilara-Barna and Atpada. Bypass is proposed at Ransigaon.

Road Geometrics Improvement proposed near village Pundlu and at road from Pundlu to Borunda.

slide20

GOTAN TO BORUNDA

N

To Merta

Total Length - 28KM

Gotan

To Merta

RAM NAGAR

Village

Dhanapa Crossing

To Jodhpur

Pundlu Village

Toll Plaza

BasniSejan Crossing

Borunda

slide21

Road Geometrics Improvement

Existing Length = 850m

PUNDLU

Existing Length = 225m

Proposed Length = 525m

Proposed Length = 105m

Existing Road

Proposed Road

slide22

Road Geometrics Improvement

Proposed Length = 515m

Existing Length = 950m

Existing Road

Proposed Road

slide23

BORUNDA TO KHEJARLA

BORUNDA

(VIA: RANSIGAON)

(LENGTH - 27KM)

To MERTA

To PIPAR

N

Toll Plaza

HARIADHANA

RANSIGAON

To SH-21

To PIPAR

To KHARIYA

METHAPUR

To GAHNAMAGARA

VILLAGE

KHEJARLA

slide24

RANSIGAON TO

KHARIAMEETHAPUR

(LENGTH - 20KM)

MURKASNI

RANSIGAON

N

JHAAK

RIVER

RIVER

Toll Plaza

UDALIYAWAS

To JAIPUR

NH 112

To JODHPUR

NH 112

KHARIAMEETHAPUR

slide25

Proposed bypass at Ransigaon

TO BORUNDA

Existing Length = 2470m

EXISTING TRAFFIC FLOW

PROPOSED TRAFFIC FLOW

Prop. Length = 1800m

TO kHEJARLA

RANSIGAON

Existing Length = 3130m

Prop. Length = 2500m

TO KHARIAMEETHAPUR

Existing Road

Proposed Road

slide26

KHARIAMEETHAPUR TO BILARA

To JAIPUR

(LENGTH - 3KM)

KHARIAMEETHAPUR

N

NH 112

To JODHPUR

NH 112

To JAITARAN

Bilara

To SOJAT

To NH-14

slide27

TO DEORIA VILLAGE

BILARA TO

SOJAT

CHOPARA FEEDER

TO HARSH VILLAGE

Bilara

BARNA

(LENGTH - 30KM)

N

TO DEOLI KALAN

Toll Plaza

ATBARA

TO CHITERYA VILLAGE

RUNDIYA

TO BOYAL

MANDLA

SH

62

SH

58

Toll Plaza

RIVER

Sojat

NH

14

RIVER

slide34

Traffic Projections

As per IRC-37:2001 7.5% increase in traffic per Annum

As per Model Concession Agreement 6% increase in traffic per Annum

For pavement design :

CBR : 10%

VDF :

BUS 1.5

Truck 3.5

LCV 1.5

Hence for crust design purposes as per IRC-37:2001

slide36

Laning Requirement

Capacity of 2 lane with earthen shoulder exhausting in year 2023 in respect of Borunda to Khariameethapur, in year 2025 in respect Bilara to Sojat and year 2030 in respect to reach from Gotan to Borunda hence to two lane with paved Shoulder will be required.

slide40

Location of Proposed Toll Plazas

  • To make Toll realization realistic and to facilitate public of this area the entire road has been divided into 4 Toll Zones.
  • The Toll Plazas do not fall with in 10 Km Municipal Area
  • The Toll collected at one of the plazas will be verified at the other one.
slide46

Toll Realisation

For Toll Realisation following exemption have been made

Of the net Tollable Traffic 85% Toll realisation has been assumed in the project viability calculation.

slide47

Project Cost Repayment

Project is viable