1 / 79

Clearview Construction

Clearview Construction. April to November 2009. Years in the dreaming, Dr. Adam Black’s vision for a new facility finally takes shape. Ground-breaking began in May. The slab is poured with radiant heating elements and water access in place. Standing up the front wall.

Download Presentation

Clearview Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clearview Construction April to November 2009 Years in the dreaming, Dr. Adam Black’s vision for a new facility finally takes shape

  2. Ground-breaking began in May

  3. The slab is poured with radiant heating elements and water access in place

  4. Standing up the front wall

  5. Dr. Black surveys the progress

  6. Adding the tin roof

  7. Front desk area

  8. Adding the doors

  9. Radiant heating control panel

  10. Sound insulation for the exam rooms

  11. Laying in kennel walls

More Related