1 / 7

Tungsten alloy blending, pressing & vacuum sintering

Activity, Competencies & Skills. Tungsten alloy blending, pressing & vacuum sintering Multi–axis CNC Milling, Turning, Grinding, EDM: Tungsten (W), Refractory and exotic Ni, Fe, Al based alloys Validation of CATIA V/STEP models and provision of full manufacturing drawings

zahina
Download Presentation

Tungsten alloy blending, pressing & vacuum sintering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activity, Competencies & Skills Tungsten alloy blending, pressing & vacuum sintering Multi–axis CNC Milling, Turning, Grinding, EDM: Tungsten (W), Refractory and exotic Ni, Fe, Al based alloys Validation of CATIA V/STEP models and provision of full manufacturing drawings Fusion related materials understanding Development of manufacturing processes and techniques Accurate, clean assembly of complex geometry items for UHV and demanding environments (JET QUA 500) Comprehensive CMM inspection to CAD models Surface Measurement & SPC.

  2. Some of our customers ◄ TungstenLB-SRP

  3. Large Research Facilities – Future Energy 1st wall upgrade to JET, €48m budget – EFDA funded to evaluate materials for ITER construction. Bulk Tungsten Divertor Contract award - €5.3m FZ Julich design qualification and manufacture complete

  4. Large Research Facilities – Future Energy 50 assemblies/80Kg each 5 exotic materials 5 axis machining 1,600 parts/assembly 80,000 parts total Clean room assembly 50μm reference tolerances

  5. Large Research Facilities – Future Energy

  6. Large Research Facilities – Future Energy

  7. Business Development – Future Energy The next steps :ITER – (47%) EU, with a €10bn budget. We are looking a Prime Contractor or 1st tier supplier to participate/collaborate with! Thank you for your attention!

More Related