Belfast Hotel Project

Belfast Hotel Project. 141 Bedrooms 15 VRF 3-Pipe Systems 151 Indoor Units Total Installed Capacity – 398 kW Site time – 16 Weeks. Design Stage. Design Calculations - Cymap Indoor Unit Type System Capacities Pipe runs and piping restrictions. Site Drawings.

Download Presentation

Belfast Hotel Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Belfast Hotel Project • 141 Bedrooms • 15 VRF 3-Pipe Systems • 151 Indoor Units • Total Installed Capacity – 398 kW • Site time – 16 Weeks

  2. Design Stage • Design Calculations - Cymap • Indoor Unit Type • System Capacities • Pipe runs and piping restrictions

  3. Site Drawings

  4. 5-Year Peace of Mind Warranty • Design criteria met with regard to horizontal and vertical pipe runs • Validated pressure tests and evacuation procedures • Calculated refrigerant added to system • Detailed commissioning reports by certified engineer returned to Toshiba • Maintenance contract in place with an Accredited Installer • 5-Year parts and labour warranty with manufacturer not contractor

  5. Manufacturers Warranty