The impact of work study on productivity - PowerPoint PPT Presentation

Slide1 l.jpg
Download
1 / 15

the ways workstudy improves the productivity ..... in pakistan where workstudy used as a mean of enhancing the over all productivity ..!!!

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

the impact of work study on productivity

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


The impact of work study on productivity l.jpg

THE IMPACT OF WORK STUDY ON PRODUCTIVITY

MOHAMMAD YOUNUS

(O8IN70)

DEPARTMENT OF INDUSTRIAL ENGINEERING AND MANAGEMENT

MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY , JAMSHORO SINDH PAKISTAN


Contents l.jpg

Contents

INTRODUCTION TO WORK STUDY…..

TECHNIQUES OF WORK STUDY ………

ROLE OF WORK STUDY IN INSUTRIES …..

INDUSTRIES ENGAGE IN THE WORK STUDY ….

WORK STUDY LEADS TO SEPRATE INE FROM OTHERS…


I ntroduction l.jpg

INTRODUCTION

WHAT IS WORK STUDY ?????

  • Work study is old as an industry itself.

  • It is the management technique that investigate all the factor effecting the efficiency and economy of the organization in order to make improvement.

  • Work study is the mean of enhancing the (productivity) of the firm by elimination of waste and unnecessary operations, reducing cost, standardized the method and time for doing a task etc


Techniques of work study l.jpg

TECHNIQUES OF WORK STUDY

  • There are two techniques of work study ..

  • METHOD STUDY.

  • WORK MEASUREMENT.


Slide6 l.jpg

METHOD STUDY

  • Method study is the systematic recording and critical examination of existing method and propose the way of doing work.

STANDARD

METHOD

SYSTEMATIC

RECORDING

CRITICAL

EXAMINATION

Process charts,

Diagrams, Therbligs

Improved

performance


Work measurement l.jpg

WORK MEASUREMENT

Work measurement is the application of techniques designed to establishing the time.

Breaking down the job into elements and find out the time of each element.

Various techniques such as,

ANALYTICAL ESTIMATION

PMTS

WORK SAMPLING

TIME STUDY.


Graphical representation of work study l.jpg

GRAPHICAL REPRESENTATION OF WORK STUDY

METHOD STUDY

Examining a job and Finding the most efficient method to perform it.

WORK STUDY

TIME STUDY

Determining the time

Necessary to perform a job And its elements.

HIGHER PRODUCVITY


Role of work study in industries l.jpg

ROLE OF WORK STUDY IN INDUSTRIES

PRODUCTION

QUALITY CONTROL

  • Standard methods.

  • Standard time.

  • Best way of doing a task.

Quality control rely on time standards and process analysis

WORK STUDY

INDUSTRIAL RELATION

SALES

Product cost is largely a function of manufacturing methods and measurement control.

Good labor relations result from equality wages based on work content.


Veiws of industrial engineer s about work study l.jpg

VEIWS OF INDUSTRIAL ENGINEER’S ABOUT WORK STUDY

75%

50%

WORK

STUDY

45%

  • This is a views of various graduates and undergraduates IN ENGINNEER’S


Industries engage in work study l.jpg

INDUSTRIES ENGAGE IN WORK STUDY

There are No. of industries either multi-national or national few of them are as follows ….

MULTI-NATIONAL INDUSTRIES …!!

NATIONAL INDUSTRIES….!!!


Slide12 l.jpg

How Work Study leads to separate the industrial engineering from other engineering and business aspects ?????

Since ,

Work study

System effectives


Slide13 l.jpg

Where as ,

Mechanical

engineering

DESIGNING ASPECTS

Business Administration

(i-e MBA’S )

Managing the non technical resources

So neither MECHANICAL engineer nor any MBA can perform the work study !!!! Only INDUSTRIALengineer’s can done the work study for system effectiveness …!!!