1 / 8

EDUSAFE – KICK OFF

EDUSAFE – KICK OFF. WP3 - Safety system modularity. PARTNERS. CERN NTUA PRISMA ELECTRONICS Lead Beneficiary: PRISMA. EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3. Objectives.

yoshe
Download Presentation

EDUSAFE – KICK OFF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDUSAFE – KICK OFF WP3 - Safety system modularity

  2. PARTNERS • CERN • NTUA • PRISMA ELECTRONICS • Lead Beneficiary: PRISMA EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  3. Objectives • Studying the scalability and adaptability potential of the hardware and the software of the PSS module, the Control System and the Data Acquisition system for other markets and different types of environment. Focus is also on the safety system modularity and integration aspects. EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  4. Work plan WP2 VR+AR Requirements WP3 Potential Markets Requirements WP4 HMI + UI Requirements • WP3 • Personal Supervision System + Control System + DAQ • Optimization • Modularity • Multiple Interfaces WP6 Final Integration + Demonstration WP5 Technology assessment + Exploitation EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  5. Partners’ Role • CERN will provide the environmental and usability requirements for operational and emergency use and the infrastructure required for the Control System (CS) and Data Acquisition (DAQ). • PRI will study and develop the PSS system HW and SW modularity, integration, interfaces optimization and adaptability to new infrastructure supports and new markets. • NTUA will design and modify the CS and DAQ to meet the AR technology requirements and study scalability and adaptability for various environments and markets. EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  6. Deliverables D3.1 Control and DAQ system HW and SW architecture design report, PSS module HW and SW architecture design report (M16) D3.2 Annual appraisal of research progress and training (M18, 30, 42) D3.3 PSS module, CS, DAQ first prototype developed, performance test and system documentation (M32) D3.4 PSS module, CS, DAQ 2nd prototype developed, performance test and system documentation (M40) D3.5 PSS system module, CS, DAQ HW+ SW final doc. incl. final tests results and recommendations, and incl. report on scalability and adaptability to different infrastructure and environmental conditions (M42) D3.6 Presentation of Fellow’s research at end conference (M48) EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  7. Milestones M19 PSS module design, CS and DAQ system architecture design (M16) M20 PSS module first prototype manufactured, Control system and DAQ first prototype developed (M30) M21 PSS module final prototype developed (M36) M22 Local specific trainings completed (M42) EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3

  8. Fellows ESR5 – NTUA - Control System (M5) The Fellow will study and support the complete development of a rugged, scalable and adaptable control system and help build a prototype of the CS and DAQ for testing in the ATLAS environment. ESR6 – PRI (DUTH) - PSS system modularity/ integration optimization (M5) The Fellow will study the development of a fully integrated system based on the different research components in the project and PSS requirements, based on the CERN PSS structure. EDUSAFE – KICK OFF MEETING 17/9/2012 – WP3