Oil Load Serving Study Update. August 18 th , 2011. OIL LOAD SERVING STUDY AREA. WILLISTON LOAD POCKET. ASSUMPTIONS. MCDC LIMITED TO 100MW E-W MDU PEAKERS OFF LEWIS & CLARK GEN ON WIND OFF CULBERSTON OFF BUT AVAILABLE FOR PRIOR OUTAGES FORT PECK GENERATION = 35MW, MAX ~135MW

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Oil Load Serving Study Update' - yon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
assumptions

ASSUMPTIONS

MCDC LIMITED TO 100MW E-W

MDU PEAKERS OFF

LEWIS & CLARK GEN ON

WIND OFF

CULBERSTON OFF

BUT AVAILABLE FOR PRIOR OUTAGES

FORT PECK GENERATION = 35MW, MAX ~135MW

WINTER PEAK LOADS

challenges

CHALLENGES

VOLTAGE STABILITY

LOW VOLTAGE, POWER QUALITY, POOR “PROFILE”

REGIONAL LOAD INCREASES

115KV LINE OVERLOADS

MAINLY FEEDING WILLISTON POCKET

slide9

EXISTING SYSTEM

Charlie Creek-Williston at 115kV

Charlie Creek

345kV Line

230kV Line

115kV Line

slide10

BASELINE FORECAST

Existing System Limit Until July 2012

slide11

July 2012

Charlie Creek-Williston at 230kV

slide13

Williston-CCR 230

& Cap Additions

BASELINE FORECAST

slide14

2013

Networked 115kV

Des Lacs

slide16

Williston SVC

BASELINE FORECAST

slide18

ADD 345KV

BASELINE FORECAST

slide20

BASELINE FORECAST

Williston-CCR 230

& Cap Additions

Networked 115kV

slide21

BASELINE FORECAST

Networked 115kV

Williston-CCR 230

& Cap Additions

slide22

BASELINE FORECAST

Networked 115kV

Williston-CCR 230

& Cap Additions