S. EVRARD, EN-MEF

TDC2-TCC2 consolidation status report to EATM. 04.03.2014 In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/. S. EVRARD, EN-MEF. Outline. 2014 schedule Worksite progress Dedicated working groups. 2014 Schedule. Removal of hot items.

yoko
Download Presentation

S. EVRARD, EN-MEF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDC2-TCC2 consolidationstatus report to EATM 04.03.2014 In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/ S. EVRARD, EN-MEF

  2. Outline • 2014 schedule • Worksite progress • Dedicated working groups

  3. 2014 Schedule ALARA L3 Committee

  4. Removal of hot items • Removal of hot items from the worksites: • TCSC removed first and brought to B.955 • 3 splitter2 magnets and 2 MDLV removed and stored in TDC2 • Many beam monitors, BLM and vacuum beam pipes

  5. Removal of hot items 3 splitter2 magnets 2 MDLV magnets

  6. Splitters

  7. MDLV

  8. Beam instrumentation ALARA L3 Committee

  9. Chilled pipes exchange ALARA L3 Committee

  10. Secondary beam line vacuum maintenance • Nous avons remplacé l’huile des pompes à palettes et remplacer 4 pompes à vide dans le cadre de la rénovation. • Apres contrôle par PVSS il reste à contrôler le vide sur place au niveau de chaque pompe à vide • Placer une plateforme pour déplacer les deux pompes du M2, (fabrication à l’atelier 887) • détection de fuite ALARA L3 Committee

  11. Dedicated working groups • LV systems and Cabling • XTAX repair ALARA L3 Committee

  12. Cabling detailed study ALARA L3 Committee

  13. Cabling EN-EL schedule • 31/3 WDP assessment for Alara level • 31/3-21/4 preparation Dry Run presentation • 22/4 Dry Run discussion within CF Section • 28/4 ENTM Dry Run • 12/5 Alara Committee (if the study confirms to be a level III) ALARA L3 Committee

  14. Life expired equipment LV systems

  15. XTAX repair Solutions Poussoir a ressort (maintient de la coupelle pendant le levage) Remplacement des pattes de guidage par une surface d’appui complète Coupelle de positionnement Nouveau soufflet (Plus grande course) Vérin Nouvelle tête de vérin