Project presentation phase 2 system requirements specification
This presentation is the property of its rightful owner.
Sponsored Links
1 / 39

PROJECT PRESENTATION - PHASE 2 System Requirements Specification PowerPoint PPT Presentation


  • 45 Views
  • Uploaded on
  • Presentation posted in: General

PROJECT PRESENTATION - PHASE 2 System Requirements Specification INSTRUCTOR : Dr. LAWRENCE CHUNG TEACHING ASSISTANT : RUTVIJ MEHTA. INTRODUCTION. Problem Process Product Changes from Phase 1 Demo Why we are better. PROBLEM. PROBLEM STATEMENT.

Download Presentation

PROJECT PRESENTATION - PHASE 2 System Requirements Specification

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Project presentation phase 2 system requirements specification

PROJECT PRESENTATION - PHASE 2

System Requirements Specification

INSTRUCTOR : Dr. LAWRENCE CHUNG

TEACHING ASSISTANT : RUTVIJ MEHTA


Introduction

INTRODUCTION

Problem

Process

Product

Changes from Phase 1

Demo

Why we are better


Problem

PROBLEM


Problem statement

PROBLEM STATEMENT


Problem statement1

PROBLEM STATEMENT


Problem statement2

PROBLEM STATEMENT


Fishbone diagram

FISHBONE DIAGRAM


Process

PROCESS


Activity diagram

ACTIVITY DIAGRAM


Sadt diagram level 0

SADT DIAGRAM LEVEL 0


Sadt diagram level 1

SADT DIAGRAM LEVEL 1


Sadt diagram level 2

SADT DIAGRAM LEVEL 2


Product

PRODUCT


High level use case diagram

HIGH LEVEL USE CASE DIAGRAM


Specific visual use case diagram

SPECIFIC VISUAL USE CASE DIAGRAM


Class diagram

CLASS DIAGRAM


Sequence diagram

SEQUENCE DIAGRAM


Sequence diagram1

SEQUENCE DIAGRAM


High level architecture

HIGH LEVEL ARCHITECTURE


Sadt level 0 diagram

SADT LEVEL 0 DIAGRAM


Sadt level 1 diagram

SADT LEVEL 1 DIAGRAM


Sig usability

SIG - USABILITY


Sig security

SIG - SECURITY


Sig performance

SIG - PERFORMANCE


Changes from phase 1

CHANGES FROM PHASE 1


Project presentation phase 2 system requirements specification

DOMAIN REQUIREMENT ISSUE - INCOMPLETERequirement: The user shall know how to use the basic features of the Android phone.


Domain requirement issue ambiguity requirement the user shall have an android phone

DOMAIN REQUIREMENT ISSUE - AMBIGUITYRequirement: The user shall have an Android Phone


Project presentation phase 2 system requirements specification

DOMAIN REQUIREMENT ISSUE - INCOMPLETERequirement: The phone must have an inbuilt microphone to record speech


Fr issue incomplete ambiguity

FR ISSUE – INCOMPLETE, AMBIGUITY

The call for help feature will allow the user to select from the emergency services, family and their assistant and puts them in touch within 10 seconds.


Fr issue incomplete

FR ISSUE – INCOMPLETE

The medical device monitor will allow elderly people to send their vital signs data from remote devices such as a weighing scale, sphygmomanometer and cardio belt to the smart phone via Bluetooth, where it is saved in the same format in which it is received and maintaining the case history of patients.


Fr issue american sign language

FR ISSUE – American Sign Language


Non functional

NON-FUNCTIONAL


Issue in 001 tradeoff between reliability and responsiveness

Issue IN+001 – Tradeoff between Reliability and Responsiveness


Issue in 003 preference for android api

Issue IN+003–PREFERENCE FOR ANDROID API


Why are we better

WHY ARE WE BETTER?

All disabilities considered

Systematic Decision Making

Traceability

Spiral Model

Pareto principle

Version Control


Why are we better1

WHY ARE WE BETTER?

Key Features:

Emergency Service

Medical Device Monitor

Finance Planner

Medication Reminder

Photo Album

Sign Language


Project presentation phase 2 system requirements specification

DEMO


Any questions thank you

Any Questions???Thank You…


  • Login