Civil Engineering Dept.
Download
1 / 26

Infrastructure planning and management - PowerPoint PPT Presentation


  • 82 Views
  • Uploaded on

Civil Engineering Dept. Master Program. Infrastructure planning and management. Lecture(4). 2013-2014. Measurement of System performance . Infrastructure performance measurement.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Infrastructure planning and management' - yeva


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Civil Engineering Dept.

Master Program

Infrastructure planning and management

Lecture(4)

2013-2014


Measurement of System performance

Infrastructure performance measurement

Infrastructure performance measurement must be multidimensional, reflecting the full range of social objectives set for infrastructure system . The performance of infrastructure could be measured by effectiveness, reliability, and cost.






Losses of Value of Infrastructure Facilitates

  • Condition of being antiquated, old-fashioned, or out-of-date

  • No longer meets current needs or expectation levels

    • Aging, technology, standard change

    • 2-yr old computers good example

  • Inability to meet changing performance requirements


Obsolescence & Service Life

  • “Always remember that someone, somewhere is making a product that will make your product obsolete”

    • -Georges Doriot

  • “Planned obsolescence” by Vince Packard’s The Waste Makers

    • Practice of deliberately designing products to last for a shorter period of time

    • Systemically doing this leads to inferior products


Obsolescence & Service Life, What Causes It?

  • Technological change

  • Regulatory change

    • SDWA forced upgrades

  • Economic / social changes

  • Value / behavior changes


Service vs. Physical Lives

  • Physical Lives: time it takes for infrastructure to wear out/fail

    • Predicting this may be irrelevant

  • Service life: time actually used

    • In general these 2 are different

  • Power plants become obsolete because of technology/policy changes

  • In some cases, tax code drives expectations


Service Lives, Connections

  • “Design service life” only meaningful if defined in terms of obsolescence

    • Assumptions about lifetime will likely change over time

    • Infrastructure seldom abandoned before replacement in place

    • Expectations will increase

  • Need to consider expectations and deterioration functions


Service Lives, Rates of Change

  • Information economy is making older transport modes obsolete

    • E.g., ground -> air shipping

  • How long should infrastructure last?

    • Physical or service?

    • “How long do you want to use it?”

    • Where will it go when we’re done?

    • What could we do with Roman roads now?


Service Lives, Strategies to Mitigate

  • Plan and design for flexibility

  • Build to assure optimum performance level is achieved

  • Monitor change to defer obsolescence

  • Refurbish and retrofit early





Sample Cash Flow Diagram rate

F

n

P

A

A

A

A

A

F

P

A

A

A

A

A




Examples rate

A project costs $40,000,000 and takes five years to construct. If all of this money is borrowed at the beginning of construction, how much money is owed by the sponsor when the project is ready to operate? If the money is borrowed in five equal installments, how much is owed? In each case, assume 7 percent interest for money borrowed.

F=??

40M$

F=??

F=F1+F2=38,005,912+11,220,413

=49,226,325M$

8M$

8M$

8M$

8M$

8M$


Homework rate