html5-img
1 / 1

U.S. ARMY PROJECT 2002-2003

U.S. ARMY PROJECT 2002-2003. In May 2002 RMR was the successful bidder for the U.S. Army to deliver two (2) completely refurbished GP-9 locomotives. Both locomotives had to be completely re-manufactured to Military Specifications.

yen
Download Presentation

U.S. ARMY PROJECT 2002-2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U.S. ARMYPROJECT 2002-2003 • In May 2002 RMR was the successful bidder for the U.S. Army to deliver two (2) completely refurbished GP-9 locomotives. • Both locomotives had to be completely re-manufactured to Military Specifications. • The overhaul included new High and Low voltage cabling and wiring plus a state of the art wheel slip control system. The trucks and car body were remanufactured to original OEM specifications. • The first locomotive was to be delivered to the Army in January 2003, with the second locomotive to be delivered in May 2003. • Both locomotives were delivered ahead of schedule by three (3) months. • The contract included delivery of complete wiring and mechanical diagrams, one (1) year supply of consumables, various spare parts and scheduled maintenance documentation.

More Related