An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2016 • Budget: 350.000 EUR. • Location: Olympic Channel, Madrid, Spain. • Figures: BMS to supervise all the electric installation of the Olympic Broadcasting System. • Design all the IT System • Program all the devices to transform the Modbus serial protocol to Modbus/TCP • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Perform all the graphical part including all the customer request. • Analyse of TCP/IP communications over LAN MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  2. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2016 • Budget: 100.000 EUR. • Location: Ullastres, Madrid, Spain. • Figures: BMS to supervise all the installation of Ullastres. Report data from SQL server. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Review customer specifications to ensure quote is technically compatible and competitive. • Incorporate use of technological capabilities to improve processes and efficiency. • Global BMS with Big Data and SQL Server. • Create a report to analyze the information of each installation. • Perform all the graphical part including all the customer request. • Analyse of TCP/IP communications over Internet. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  3. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2015 • Budget: 100.000 EUR. • Location: MutuaIntercomarcal, Barcelona, Spain. • Figures: Lighting, HVAC and metering of the offices in MutuaIntercomarcal. • Match products to customer specifications by demonstrating knowledge of products. • Review customer specifications to ensure quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Analyse of TCP/IP communications over Internet. • Incorporate use of technological capabilities to improve processes and efficiency. • Perform all the graphical part including all the customer request. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Supervise the system installation in all the offices. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  4. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 100.000 €. • Location: Parador de León, León, Spain. • Figures: Lightning, HVAC and metering control with SmartStruxure and SmartStruxure Lite control. • Communication performance test with Zigbee PRO protocol in the rooms. • Propose and analyse different control scenarios. • Communication test to SmartStruxure Solution. • Analyse of TCP/IP communications over LAN. • Analyse and solve pending issues required by the final client at the installations. • Technical documentation about the control installation. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  5. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 10.000 EUR. • Location: Cepsa, Getafe, Spain. • Figures: Lighting, HVAC and metering of the gas station. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Match products to customer specifications by demonstrating knowledge of products. • Review customer specifications to ensure quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Supervise the system installation in Getafe, Madrid and perform test with an IP public connection. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  6. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 50.000 EUR. • Location: Hotel Marriot, Mallorca, Spain. • Figures: HVAC control with SmartStruxure Lite with SmartStruxure platform. • Review customer specifications ensuring quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Analyze the signal range because is a wireless solution technology in the room part. • Supervise the control installation done by the system integrator. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  7. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2013 • Budget: 500.000 €. • Location: Gran Canaria Airport. • Figures: Lightning, HVAC and metering control with SmartStruxure to Wonderware software. • Communication performance test with BACnet and Modbus protocol. • Propose and analyse different control scenarios. • Communication and performance test to Wonderware software. • Define IT architecture to connect Automation Server to Wonderware. • Analyse and solve pending issues require by the final client at the airport installation. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  8. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2012 • Budget: 100.000 EUR. • Location: Schneider Electric, Barcelona, Spain. • Figures: Homologation of Automation Servers as a official BACnet IP controller in Gas Natural • Prepare technical documents (Tested Documented Validated Architecture, presentation). • Perform a demo to test the BACnet connectivity. • Coordinate and verify with the client all the specifications to the test. • Supervise the execution of the demo test. • Analyse and solve pending issues in the demo. • Represent the company to the customer during the different tests. • Analyse of TCP/IP communications over Internet. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  9. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2012 • Perform the first communication test with all the platform products. • Test all the communication protocols of the control solution (BACnet, Zigbee PRO, Enocean, Modbus, Web Services). • Prepare technicaldocumentation and trainings (specs, costs, estimates,operation manuals, TDVA). • Coordinate and verifythe range with the wireless protocols Zigbee PRO and Enocean. • Supervise the execution of works related to this platform. • Analyse of TCP/IP communications over Internet to cloud. • Analyse and resolve pending issues imposed by the final client at the installations. • Represent the company as a country technical leader. • Budget: 200.000 EUR. • Location: Schneider Electric, Spain, Barcelona. • Figures: Launch control platform, SmartStruxure Lite. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES

  10. Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2011 • Budget: 100.000 EUR. • Location: UOC, Barcelona, Spain. • Figures: Updatethe web-site “Information to theStudent” • Prepare all the web sites in the Internet portal. • Choose and design the web style with CSS. • Management the content of the web with the software OPENCMS. • Perform all the links to the other UOC web sites. • Provide support, as requested, to all the teachers in the university. • Program the teacher academy request with HTML, JAVASCRIPT and PHP. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES