Storm Preparedness Workshop. Verizon Florida, LLC May 23, 2007. Presentation Overview. Verizon’s new fiber network Pole inspection and replacement Disaster planning, response and recovery. Verizon’s New Fiber Network.

Download Presentation

Storm Preparedness Workshop

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Storm preparedness workshop

Storm Preparedness Workshop

Verizon Florida, LLCMay 23, 2007


Presentation overview

Presentation Overview

  • Verizon’s new fiber network

  • Pole inspection and replacement

  • Disaster planning, response and recovery


Storm preparedness workshop

Verizon’s New Fiber Network

  • Verizon Florida actively maintains its network and invests heavily to ensure network reliability. A substantial portion of the network has already been placed underground.

  • Maintaining a sound, reliable network is critical in today’s highly competitive market.

  • Verizon has spent nearly $750 M since 2004 deploying fiber facilities underground in Florida.

  • Verizon will pass approximately 1.3 M households by 2010 out of a projected 1.7 M in our territory.


Storm preparedness workshop

Verizon’s New Fiber Network

  • Verizon’s fiber-optic network is storm hardened – 99.9% underground means nothing can “fall” on the network and interrupt service during adverse weather conditions. Fiber itself is impervious to water and keeps functioning even when wet.

  • Restoration is substantially faster than with copper and splicing just one fiber cable immediately puts anywhere from one to hundreds of customers back in service.

  • Verizon’s fiber facilities deliver substantial benefits to consumers while increasing our network’s ability to withstand storm conditions.

Storm Hardened Infrastructure


Underground fiber placement

Underground Fiber Placement

Fiber deployment is widespread and is impervious

to weather.


Fiber hub and terminal

Fiber Hub and Terminal

Fiber Distribution Hub

Fiber Distribution Terminal

Fiber from central offices connects to distribution

Hubs then on to distribution terminals that serve

four customers each.


Ont and battery back up

ONT and Battery Back-Up

Battery Back-Up

ONT

Battery Back-up Provides Emergency Power to the ONT for up to 8 Hours.

c

Fiber drops connect the distribution terminal to the ONT mounted at the customer's Location.


Pole inspection and replacement

Pole Inspection and Replacement

  • Verizon has been aggressively inspecting telephone poles throughout its service territory.

  • Over 7,700 pole inspections have been completed since September 2006 and 2,200 are being replaced.

  • All poles failing inspection are replaced and not treated.


Disaster planning response and recovery

Disaster Planning, Response and Recovery

  • Verizon has substantial experience in disaster preparedness, response procedures and best practices.

  • Service protection and restoration strategies are an integral part of Verizon’s system wide network management and operations.

  • The Southeast Region Control Center (RCC) has access to Verizon’s nationwide resources such as additional equipment, manpower and supplies.

  • Verizon’s wireless resources have been used extensively during previous disasters.


Disaster planning response and recovery1

Disaster Planning, Response and Recovery

  • Verizon dispatches its workforce by pre-assigned grid after it has been determined by the appropriate County Emergency Operations Center (EOC) that it is safe to start assessments.

  • Damage assessments for each grid are transmitted in near real time to Verizon’s RCC.

  • After assessments are completed, teams of technicians are dispatched to repair damage and restore service in affected grids.


Storm preparedness workshop

Key Indicators

Construction underway

Construction completed

Customer reported trouble

Damage assessment underway

This icon represents: Currently doing the damage assessment