An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Kuninkoja-Stormwater investment and stormwater programme of Turku 11.11.11 Tallinn Olli-Pekka Mäki

  2. Management of stormwaters

  3. Background information Kuninkoja –brook: Drainage area 27 km2 Length of the main channel 7 km Built area 30 % Fields 9 % Forest 40 %

  4. Locally valuable scenery element • Diverse habitat: bogs, meadows, groves (oak, ash) • 10 fish species have been observed • ~1 km of 7 km channel length is constructed area and water flows in pipes

  5. Cluster of space demanding shops have been build in three years 2008-2010 ~ 440 000 m2 No measures taken to delay the stormwater runoff to Kuninkoja Flooding has increased Situates outside city border

  6. Stormwater planning and investment • Target is to • prevent the disadvantages of flooding • increase the use of surface water elements in planning and construction of parks and greenery areas • decrease rapid water level variations in brook • maintain biodiversity • Environmental and City Planning Department responsible for planning • Real Estate Department resbonsible for constructing and maintaining • Budget of stormwater measure is ~ 61 000 € • Construction during 2012

  7. Stormwaterplan • Floodreservoir of ~2000 m3 • Planting of wetlandplantspecies • Meandering of channel

  8. Thank you!

  9. Quality of stormwater in Turku