1 / 36

Flood Risk Management with Advanced Geospatial, Engineering and Mapping Tools

Flood Risk Management with Advanced Geospatial, Engineering and Mapping Tools. David Love, PE, CFM - Charlotte-Mecklenburg Storm Water Services. NC Section ASCE Spring Seminar. April 25, 2014. Overview. Introduction National Flood Insurance Program Mecklenburg County

wylie
Download Presentation

Flood Risk Management with Advanced Geospatial, Engineering and Mapping Tools

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flood Risk Management with Advanced Geospatial, Engineering and Mapping Tools David Love, PE, CFM - Charlotte-Mecklenburg Storm Water Services NC Section ASCE Spring Seminar April 25, 2014

  2. Overview NC ASCE Spring Seminar Introduction National Flood Insurance Program Mecklenburg County 3D Interactive Floodzone Mapping & Flood Map Review Risk Analysis Risk Reduction & Losses Avoided Tools Recap

  3. Early National Flood Insurance Program NC ASCE Spring Seminar National Flood Insurance Act of 1968: • Better indemnify individuals for flood losses through insurance; • Reduce future flood damages through State and community floodplain management regulations; and • Reduce Federal expenditures for disaster assistance and flood control. Flood Disaster Protection Act of 1973 • Mandatory purchase requirement • Community participation required for Federal assistance National Flood Insurance Reform Act of 1994 • Increased limit on amount of coverage • Increased Cost of Compliance • Community Rating System

  4. Charlotte-Mecklenburg County Overview NC ASCE Spring Seminar

  5. Charlotte-Mecklenburg Flood Mitigation Program History NC ASCE Spring Seminar Mecklenburg County Drainage Commission - 1911 Initial Floodplain Boundary Maps in August 1978 Charlotte-Mecklenburg Storm Water Services formed in 1993 following NPDES Phase I storm water regulations Funded primarily through County-wide storm water fee County / City roles Program Responsibilities Current Staff – 9 Current MCFMP Budget – $2.1 Million

  6. Flood History in Charlotte, NC NC ASCE Spring Seminar • Nearly 50 major flood events in the past century • 17 known deaths and more than $80 million in property damage   • Heavy impact from tropical systems • Tropical Storm Jerry, 1995 • Tropical Storm Danny, 1997 • Tropical Storm Fay, 2008

  7. Effective Floodplain Mapping • Effective maps in transition from 2004 County-wide FIS • 350 miles of detailed study streams • 32 watersheds • FEMA and Community flood fringe and floodway • DFIRM in state-wide format effective March 2, 2009 with 184 panels • Remapping began in 2007 on two basins • PMR 1 area effective February 19, 2014 • PMR 2 estimated for 2015, PMR 3 in 2016 NC ASCE Spring Seminar

  8. 3D Interactive Floodplain Mapping NC ASCE Spring Seminar

  9. Property Search NC ASCE Spring Seminar

  10. Flood Map Review NC ASCE Spring Seminar

  11. Property Search NC ASCE Spring Seminar

  12. Flood Risk Data Hierarchy Flood Risk Personalysis • Paper Flood Maps NC ASCE Spring Seminar

  13. Flood Risk Data Hierarchy Flood Risk Personalysis • Paper Flood Maps NC ASCE Spring Seminar • Digital Flood Data (FEMA FIRM Database / NFHL)

  14. Flood Risk Data Hierarchy Flood Risk Personalysis • Changes Since Last FIRM (Non-Regulatory) • Paper Flood Maps NC ASCE Spring Seminar • Digital Flood Data (FEMA FIRM Database / NFHL)

  15. Flood Risk Data Hierarchy Flood Risk Personalysis • Generalized Flood Risk Assessments (Non-Regulatory) • Changes Since Last FIRM (Non-Regulatory) • Digital Flood Data (FEMA FIRM Database / NFHL) • Paper Flood Maps NC ASCE Spring Seminar

  16. Flood Risk Data Hierarchy Flood Risk Personalysis • Flood Depth & Analysis Grids (Non-Regulatory) • Generalized Flood Risk Assessments (Non-Regulatory) • Changes Since Last FIRM (Non-Regulatory) • Digital Flood Data (FEMA FIRM Database / NFHL) • Paper Flood Maps NC ASCE Spring Seminar

  17. Flood Risk Data Hierarchy Flood Risk Personalysis • Water-Surface Elevation Grids (Non-Regulatory) • Flood Depth & Analysis Grids (Non-Regulatory) • Generalized Flood Risk Assessments (Non-Regulatory) • Changes Since Last FIRM (Non-Regulatory) • Paper Flood Maps NC ASCE Spring Seminar • Digital Flood Data (FEMA FIRM Database / NFHL)

  18. Flood Risk Data Hierarchy Flood Risk Personalysis • Building-Specific Information • Finished Floor Elevation (FFE) • Building Footprint • Structure/Occupancy Type • Structure/Contents Replacement Value • Water-Surface Elevation Grids (Non-Regulatory) • Flood Depth & Analysis Grids (Non-Regulatory) • Generalized Flood Risk Assessments (Non-Regulatory) • Changes Since Last FIRM (Non-Regulatory) • Paper Flood Maps NC ASCE Spring Seminar • Digital Flood Data (FEMA FIRM Database / NFHL)

  19. RISK ANALYSIS RISK REDUCTION TOOL

  20. RARRT Concept Overview NC ASCE Spring Seminar Three step process

  21. Flood Risk Score NC ASCE Spring Seminar • Impact-based scoring • Determined by assigning probability (return period) to various flood impacts (damage or loss) to property • Location-based scoring • Multiplier to impact-based scores for structures located in known risk zones • Depth-velocity hazard zones • Proximity to storm drainage overflows

  22. Impact-based Scoring NC ASCE Spring Seminar • Each property independently assessed in GIS using aerial imagery, flood model data, building footprints, elevation certificates and other County data layers

  23. Location-based Multiplier NC ASCE Spring Seminar • Depth-Velocity Hazard Zones • Created using velocity and flood depth rasters developed from effective HEC-RAS models • Determined using depth-velocity curves tied to safety criteria for people • High danger = Significant hazard to adults • Moderate danger = Significant hazard to children

  24. Flood Mitigation Techniques NC ASCE Spring Seminar • Mitigation recommendations made for each flood prone property • Each of 19 mitigation techniques evaluated and placed into one of four categories:

  25. Losses Avoided Tool • Data Requirements • Source data • High Water Marks • Updated when new events occur • Mitigation Implementation • Updated as new mitigations occur • WSEL rasters • Vehicle parking • Property improvements • Parcels • Building replacement value lookups NC ASCE Spring Seminar

  26. Losses Avoided • Data Requirements (cont’d) • Storm-specific information • High Water Marks • Building replacement value lookups(at time of event) • Displacement cost per sq.ft.(at time of event) • Emergency responder cost (at time of event) NC ASCE Spring Seminar

  27. Risk Analysis Example

  28. FIRM Panel 4542 NC ASCE Spring Seminar

  29. Water Surface Elevation Grid NC ASCE Spring Seminar

  30. Water Surface Elevation Grid NC ASCE Spring Seminar

  31. Water Surface Elevation Grid NC ASCE Spring Seminar

  32. Water Surface Elevation Grid NC ASCE Spring Seminar

  33. Water Surface Elevation Grid NC ASCE Spring Seminar

  34. Water Depth Grid NC ASCE Spring Seminar

  35. Recap NC ASCE Spring Seminar NFIP & minimum national requirements Local program requirements – higher standards Web-based delivery of maps and risk products Parcel-level automated risk analysis tool Losses avoided tool

  36. Thank You David Love: david.love@mecklenburgcountync.gov NC ASCE Spring Seminar April 25, 2014

More Related