An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Colorado-Big Thompson Project Overview Presented by Ron Thomasson Water Resources Engineer Eastern Colorado Area Office

  2. Reclamation and the C-BT • Authorized by Congress in 1937 • Reclamation built, owns, and primary operator • Primary purpose: supplemental water (Ag and M&I) • Secondary purpose: hydro-electric power generation • Construction 1938-1952 • Six powerplants • 10 reservoirs

  3. Colorado-Big Thompson Project

  4. Colorado-Big Thompson ProjectTypical Operations • West Slope – store all inflow in excess of minimum streamflow requirements • East Slope – divert water through the Adams Tunnel at a time and volume in order to: • Meet demands • Maximize hydropower generation • Accommodate recreation • Accommodate maintenance activities Granby Dam

  5. Green Mountain ReservoirTypical Spring Operation • Fill reservoir by mid July • Avoid spilling the reservoir to maximize power generation • Participate in Coordinated Reservoir Operations (Peak Enhancement - minimum 15-Mile Reach flow of 12,900 cfs) Green Mountain Dam and Reservoir in early spring

  6. Green Mountain Reservoir Typical Summer/Fall Operations • Bypass inflow to meet downstream senior water rights (Shoshone/Grand Valley) • Replacement releases for out-of-priority depletions at Granby and Willow Creek • Releases to the West Slope Beneficiaries and for endangered fish Green Mountain Reservoir in late summer 2003

  7. Opportunities • Assist in demand projections • Northern Water • Denver Water • Grand Valley • Assist USFWS in setting target flows • Peak enhancement • Late summer flows in 15-Mile Reach • Initiate drought mitigation discussions (e.g. Shoshone call reduction)

  8. Questions? Green Mountain Dam and Powerplant on the Lower Blue