Trasparency:
This presentation is the property of its rightful owner.
Sponsored Links
1 / 7

Urgent Market Messages required from market participants and TSOs: PowerPoint PPT Presentation


  • 50 Views
  • Uploaded on
  • Presentation posted in: General

Trasparency: Practical example from Nordic Cou n tries. Urgent Market Message (UMM) Pasi Kuokkanen, Nord Pool Spot. Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008

Download Presentation

Urgent Market Messages required from market participants and TSOs:

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Urgent market messages required from market participants and tsos

Trasparency:Practical example from Nordic Countries. Urgent Market Message (UMM) Pasi Kuokkanen, Nord Pool Spot


Urgent market messages required from market participants and tsos

Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008

Sender’s focus: Simple generation of messages informing about the reason and consequences of planned and unplanned production and consumptionoutages

Reader’s focus: Clear and understandable messages where the meaning, i.e.consequences for production and consumption are easily comprehensible

TSO Disclosure Guidelines for Urgent Market Messages (UMMs) October 2008

Sender’s focus (TSO): Simple generation of messages informing about the reason and consequences ofplanned and unplanned transmission outages

Reader’s focus (participant): Clear and understandable messages where the meaning, i.e.the consequences for trading capacities are easily comprehensible.

Urgent Market Messages required from market participants and TSOs:


Urgent market messages required from market participants and tsos

Inside informationmeans information of a precise nature which has not been made public relating to one or more listed products, that would be likely to have a significant impact on the prices in one or more such products if made public. WHEN IS INFORMATION IS NEEDED?

  • Information about unplanned and planned outages shall always be disclosed if the available capacity represents a change of more than

    • 100 MW of installed capacity for one generator, consumption unit or transmission facility

    • more than 200 MW per production station, including changes of such plans.

  • UMM shall be sent as soon as possible and not later than 60 minutes after the decision or failure time, including information about the reason for the outage.


You can find it from nord pool spot s web pages www npspot com

You can find it from Nord Pool Spot´s web-pages (www.npspot.com)

TSO plans

Participant plans

Last UMMs

UMM login (to send UMMs)


Tso plans next 8 days

TSO plans: next 8 days


Participants plans next 6 weeks

Participants plans: next 6 weeks


Urgent market messages required from market participants and tsos

Thank you for your attentention. Pasi Kuokkanen ([email protected])


  • Login