Maintaining water quality 1 at temporary events 2 and private distribution networks
Download
1 / 56

Maintaining Water Quality ... (1) at temporary events (2) and Private Distribution Networks - PowerPoint PPT Presentation


  • 96 Views
  • Uploaded on

Maintaining Water Quality ... (1) at temporary events (2) and Private Distribution Networks. Garry Boorman Principal Advisor, Public Health & Standards. Ian Mitchell Water Regulations & Monitoring Manager. Where to start. Where to start. Where to start.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Maintaining Water Quality ... (1) at temporary events (2) and Private Distribution Networks' - wilona


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Maintaining water quality 1 at temporary events 2 and private distribution networks

Maintaining Water Quality ...(1) at temporary events(2) and Private Distribution Networks

Garry Boorman

Principal Advisor, Public Health & Standards

Ian Mitchell

Water Regulations & Monitoring Manager





The water supply water fittings regulations 1999

The Water Supply (Water Fittings) Regulations 1999

Replaced Water Byelaws

Made 1st April 1999

Laid before parliament 14th April 1999

Enforceable 1st July 1999

Section 74 Water Industry Act 1991

Water Industry Guide – guidance to schedule 2 of the Regulations (requirements for Water Fittings)

Regulations are there to provide protection for the water supply from waste; misuse; undue consumption; erroneous measurement and most importantly contamination


Waste

Water escaping from defective pipes or fittings above or below ground whether seen or not seen.

Waste ...


Misuse

Water used for any other purpose than

that for which it was legally supplied.

Misuse ...


Undue consumption

Water used in excess of the quantity required for a specific purpose.

(Jan 2001 20% reduction of the amount of water used for flushing new toilets)

Undue consumption ...


Erroneous measurement

By-passing a water meter.

Erroneous measurement...


Contamination

The possible contamination of an internal or external water supply.

Contamination ...


Risk assessment

  • Backflow by

  • backsiphonage

  • back pressure

  • Decide

  • level of risk (fluid category)

  • check for appropriate backflow device

Risk Assessment...



Backflow risk fluid category 1

Fluid Category 1 – Wholesome water, no backflow protection needed.

Backflow Risk – Fluid Category 1


Backflow risk fluid category 2

Backflow Risk – Fluid Category 2

  • Fluid Category 2 – Aesthetic deterioration

  • Examples:

  • Mixing of hot and cold water supplies

  • Stagnant water in redundant pipe work

  • Ice making machines

  • Domestic water softeners

  • Install - Single check valve fitted.


Backflow risk fluid category 3

Backflow Risk – Fluid Category 3

  • Fluid Category 3 – Slight health risk

  • Examples:

  • Water in domestic central heating systems

  • Domestic wash hand basins / baths

  • Domestic hose union taps

  • Domestic washing & dishwasher machines

  • Install - Double check valve fitted.


Backflow risk fluid category 4

Backflow Risk – Fluid Category 4

  • Fluid Category 4 – Significant health risk

  • Examples:

  • Water in non-domestic central heating systems

  • Printing and Photographic equipment

  • Commercial dishwashing equipment

  • Fire sprinkler systems using anti-freeze

  • Install - Reduced Pressure Zone Valve.


Backflow risk fluid category 5

Backflow Risk – Fluid Category 5

  • Fluid Category 5 – Serious health risk

  • Examples:

  • Grey / Rain water harvesting systems

  • Slaughter house equipment

  • Cattle drinking troughs

  • WC pans, urinals and bidets

  • Install – Storage cistern with AA / AB air gap.


Contamination domestic

Contamination - Domestic

Dead animals in cold water tank



Contamination industrial

Cross connection causing contamination by industrial / horticultural fluids

Contamination - Industrial


Spot the contravention

Spot the contravention ... horticultural fluids


Spot the contravention1

Spot the contravention ... horticultural fluids


Spot the contravention2

Spot the contravention ... horticultural fluids


Spot the contravention3

Spot the contravention ... horticultural fluids


Spot the contravention4

Spot the contravention ... horticultural fluids


Spot the contravention5

Spot the contravention ... horticultural fluids


Spot the contravention6

Spot the contravention ... horticultural fluids


Failure to comply

Failure to comply ... horticultural fluids


What went wrong

What went wrong? horticultural fluids


Approved materials

Approved Materials horticultural fluids


Temporary drinking water supplies

Temporary Drinking Water Supplies horticultural fluids


Temporary drinking water supplies1

Temporary Drinking Water Supplies horticultural fluids

It is suggested that guidance is made available to organisers of events

where a temporary drinking water supply is required so that there is an understanding of the risks associated with supplying drinking water.

Reference Document

Guidelines for the Provision of Temporary Drinking Water Supplies at Events

Water Health Partnership for Wales


Temporary drinking water supplies2

Temporary Drinking Water Supplies horticultural fluids

  • It is suggested that guidance is made available to organisers of events

  • where a temporary drinking water supply is required so that there is an understanding of the risks associated with supplying drinking water.

  • Failure to properly plan for the provision of a safe source of drinking watercan have significant consequences with the organisers

    • additional costs

    • notice and prosecution

    • high risk of an outbreak (campylobacter / E.coli O157)

    • civil action if anyone becomes ill

    • loss of reputation and public reluctance to attend future events

    • poor media coverage


Temporary drinking water supplies3

Temporary Drinking Water Supplies horticultural fluids

  • Event organisers must contact local authority Environmental Health and

  • local Water Company if a public water supply connection is needed

    • in advance of the event at the earliest opportunity

      • if new connection required at least 12 (20) weeks notice

      • to existing connection at least 4 (8) weeks notice

    • submit plans

      • to show distribution network and infrastructure

      • direction of flow

      • location of pumps, incoming supply, toilet blocks, drinking water points, water for food preparation areas,treatment and sampling points etc


Temporary drinking water supplies4

Temporary Drinking Water Supplies horticultural fluids

  • Event organisers must ...

    • undertake a risk assessment on water supply arrangements

      • identify potential risks that may cause contamination or aninsufficient water supply

      • the measures to be taken to control / prevent these

      • the checks & monitoring procedures to ensure control measures are in place

      • the actions to be taken should the control measures fail


Temporary drinking water supplies5

Temporary Drinking Water Supplies horticultural fluids

  • Event organisers must ...

    • document their emergency operating plan for dealing with contamination or failure of water supply

      • close the event

      • contingency for emergency water supplies

  • Organisers cannot rely on emergency supplies being provided by the local authority or water company

  • Suggest that the event ‘Water Safety Plan’ is submitted to the local Environmental Health department at least 14 days in advance of the event


  • Temporary drinking water supplies6

    Temporary Drinking Water Supplies horticultural fluids

    • Commissioning of the water supply

      • storage and disinfection of distribution pipe-work

        • prior to use drained, stored off ground & end capped

        • segregated from fuel oils / contaminants

        • pipe material to be of approved materials (Regulation 31 Water Supply (Water Quality Regulations 2010)

        • laying, preparation & disinfection to be undertaken byappropriately trained and certified personnel

        • check microbiological samples required

        • formal ‘Certificate of Disinfection’ provided to local authority / water company


    Temporary drinking water supplies7

    Temporary Drinking Water Supplies horticultural fluids

    • Water provision via tankers or bottled water

      • The following British Standard has been issued to provideguidance on provision of safe drinking water to events wheretankers or bottled water are used

      • BS8551:2011 Provision and management of temporary watersupplies and distribution networks (not including provisions forstatutory emergencies) – Code of Practice

      • Event organisers are strongly recommended to obtain a copy


    Temporary drinking water supplies8

    Temporary Drinking Water Supplies horticultural fluids

    • Prevention of Contamination

      • Event organisers must also ensure that the fixtures and fittingsconnected to the distribution pipe-work do not contaminate the water supply.

      • Any connections made to the public water supply must complywith The Water Supply (Water Fittings) Regulations 1999

      • Guidance to regulations available via WRAS(http://www.wras.co.uk/Regulations_guide.htm)

      • Connections to public water supply must have backflow protection.Water Company Water Regulations Inspector may visit the site tocheck for compliance


    Temporary drinking water supplies9

    Temporary Drinking Water Supplies horticultural fluids

    • During the Event

      • Environmental Health Officers may undertake inspections and sample during the event


    Temporary drinking water supplies10

    Temporary Drinking Water Supplies horticultural fluids

    • Further Recommendations of Good Practice

      • Do operational personnel hold valid National Water Hygiene cards?

      • Distribution pipe-work must not have been used for any other purpose

      • Locate any existing buried sewer, water pipes or electricity cables

      • Ensure that access to any water storage is controlled and restricted to unauthorised people

      • Consider location of fuel / paint stores (bunded?)

      • If event in warm weather consider need to insulate water pipes

      • Label taps suitable for drinking water

      • Monitor chlorine residuals

      • If overland pipes used are these adequately protected from damage

      • Undertake regular inspections of drinking water taps to ensurethey remain hygienic


    Temporary drinking water supplies11

    Temporary Drinking Water Supplies horticultural fluids


    Private distribution networks

    Private Distribution Networks horticultural fluids

    • Definitions

      • Distribution SystemArrangement of assets (pipes, tanks, pumps) that convey a supplyof wholesome water

      • Boundary / Bulk MeterThis is the end point of the public network. The point at which a thirdparty takes accountability for conveying a wholesome supply

      • Private Onward Distribution SystemTerm used to describe a privately owned arrangement of assets used to deliver water to other premises. The PODS will be supplied via a Water Undertaker or Combined Licensee. The end of the public supply is defined by a bulk meter or tank


    Private distribution networks1

    Private Distribution Networks horticultural fluids

    Guidance from DWI – 25th April 2013

    http://dwi.defra.gov.uk/stakeholders/guidance-and-codes-of-practice/

    2013 Private Distribution Systems


    Private distribution networks2

    Private Distribution Networks horticultural fluids

    Guidance from DWI – 25th April 2013


    Private distribution networks3

    Private Distribution Networks horticultural fluids


    Private distribution networks4

    Private Distribution Networks horticultural fluids

    • Examples of issues unlikely to be a Regulation 8 supply

      • caravan sites where there is a single owner of whole site

      • small industrial parks with several different businesses occupyingindividual units on one premises

      • hotel premises with outbuildings / marquee used for temporary events

      • airports / ports with single owner of whole site

      • university / college / school with single owner of whole site

      • rural estate where all buildings / homes are in the management or ownership of the estate

      • The Water Company is responsible for monitoring and enforcingthe Water Fittings Regulations 1999


    Where to end

    Where to end ... horticultural fluids


    Where to end1

    Where to end ... horticultural fluids

    Alternative supply pipework (Spring Water) now disconnected

    Temporary 25mm MDPE overland supply pipe. Installed following failure of private supply source.


    Where to end2

    Where to end ... horticultural fluids


    Where to end3

    Where to end ... horticultural fluids


    Where to end4

    Where to end ... horticultural fluids

    Cattle trough with type ‘AA’ air gap


    Where to end5

    Where to end ... horticultural fluids

    25mm MDPE pipe. Open ended pipe with no backflow protection

    Animal Faeces


    Where to end6

    Where to end ... horticultural fluids

    Outside hose union bib taps with no backflow protection


    Where to end7

    Where to end ... horticultural fluids

    Pre UV sample point – samples ‘passed’

    Post UV sample point – samples ‘failed’

    UV Disinfection Equipment