An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eagle Project Will Jarvis

  2. Red Oak-Dortches ParkPicnic Shelter • Town of Red Oak had purchased 2 picnic shelters for $31,000. • Lowest bid for construction was $30,000. • Town could not afford construction cost. Shelters had been put on hold.

  3. Before

  4. Fundraising • Troop yard sale $162.65 • Sold concessions at school $131.52 • Donations $100

  5. People Present David Dugas Sr. David Dugas Jr. Lauren Dugas Bennie Jarvis Will Jarvis Time 3 hours 3 hours 3 hours 3 hours 3 hours Saturday August 16th Today we made the layout, shot the elevation and checked materials.

  6. People Present Dave Dugas Sr. Dave Dugas Jr. David Jarvis Jerry Barnes Joey Barnes Trey Barnes Tracy Smith Ragelio Rios Bennie Jarvis Glenn Jarvis Faith Jarvis Gary Abernathy Nicholas Abernathy Will Jarvis Time 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours Saturday August 23rd

  7. Saturday August 23rd cont. Today we excavated footings, removed soil from the site, cleaned up the concrete pad and covered the openings. We used a Bobcat with an auger, a Bobcat with a bucket for excavation, and hand tools . A trailer was used to remove dirt. We ate Kentucky Fried Chicken for lunch.

  8. On the 23rd we excavated 14 tons of dirt The weight equivalent of the semi truck in the background…

  9. People Present Big Dave Dugas Little Dave Dugas David Jarvis Lauren Dugas Bennie Jarvis Betsy Dugas Will Jarvis Time 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours Sunday August 24th Today we set the column posts, plumbed and braced them.

  10. Sunday August 24th cont. We used one 5,000 watt generator, an air compressor, a nail gun, hand tools and one skill saw. We had Subway for lunch.

  11. People Present Turn-key Contractors Big Dave Dugas Time 1 hour 1 hour Tuesday, August 26th A half yard of concrete was poured into each post footing to stabilize the post.

  12. People Present Big Dave Dugas Little Dave Dugas David Jarvis Will Jarvis Mike Sutton Sr. Mike Sutton Jr. Tracy Smith Travis Smith Bill Bulluck Spencer Bulluck Pete Young Matt Young Jerry Barnes Joey Barnes Trey Barnes Time Spent 10 hours 10 hours 10 hours 10 hours 9 hours 9 hours 9 hours 9 hours 7 hours 7 hours 7 hours 7 hours 7 hours 7 hours 7 hours Saturday September 13th

  13. People Present Betsy Dugas Lauren Dugas Bennie Jarvis Faith Jarvis Glenn Jarvis Sue Yurkes Time Spent 10 hours 10 hours 9 hours 9 hours 9 hours 1 hour Saturday September 13th cont. Today we erected the superstructure of beams and purlins utilizing the truck crane.

  14. Saturday September 13th cont. Today we used a 55’ truck crane, a 36’ scissor lift, 4 8’ step ladders, 4 sections of frame, a Baker scaffold, a 5,000 watt generator and hand tools. Lunch was hot dogs, chips, drinks and cookies.

  15. Each of the beams weighed over a half ton.

  16. People Present Big Dave Dugas Little Dave Dugas Betsy Dugas Lauren Dugas Time spent 2 hours 2 hours 2 hours 2 hours Sunday September 14th Today we stripped the paper and braces from the columns using crow bars and hammers.

  17. People Present Big Dave Dugas Little Dave Dugas Betsy Dugas Lauren Dugas Will Jarvis Gary Abernathy Tracy Smith Time spent 10 hours 10 hours 10 hours 10 hours 10 hours 3 hours 3 hours Saturday September 20th Today we began to install the picnic shelter decking.

  18. Saturday September 20th Cont. We used a 5,000 watt generator, a Skil Saw, ladders, an 8’’ miter saw, hand tools and scaffolding. We had Subway for lunch.

  19. People Present Will Jarvis Bennie Jarvis Glenn Jarvis Faith Jarvis Big Dave Dugas Little Dave Dugas Lauren Dugas Betsy Dugas Time Spent 2 hours 2 hours 2 hours 2 hours 9 hours 9 hours 9 hours 9 hours Sunday September 21st We continued to deck the picnic shelters today.

  20. Sunday September 21st Cont. • We used a 5,000 watt generator an 8’’ Skil Saw, ladders and hand tools. • We ate sandwiches from home.

  21. People Present Big Dave Dugas Little Dave Dugas Betsy Dugas Lauren Dugas Mike Sutton Sr. Mike Sutton Jr. Dave Jarvis Will Jarvis Jerry Barnes Joey Barnes Trey Barnes Tracy Smith Time Spent 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours Saturday September 27th

  22. People Present Travis Smith Gary Abernathy Nick Abernathy Bennie Jarvis Faith Jarvis Glenn Jarvis Tanya Smith Sarah Smith Time Spent 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours Saturday September 27th Cont. Today we continued decking the shelter. Materials included a 26’ scissor lift, 6 scaffold, 4 ladders, a 5,000 watt generator, 2 power miters, 1 Skil Saw and hand tools.

  23. Saturday September 27th Cont. For lunch Tracy Smith barbequed 25 chickens over a wood fire.

  24. People Present Big Dave Dugas Little Dave Dugas Betsy Dugas Lauren Dugas David Jarvis Will Jarvis Bennie Jarvis Faith Jarvis Glenn Jarvis Mike Sutton Sr. Mike Sutton Jr. Jerry Barnes Trey Barnes Joey Barnes Time Spent 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours 8 hours Sunday September 28th

  25. Sunday September 28th cont. We completed installation of the decking on the picnic shelters today. We used a 26’ scissor lift, 6 sections scaffolding, 4 8’ ladders, 1 5,000 watt generator, 2 power miters, 1 Skil Saw and hand tools. We had leftover chicken for lunch.

  26. People Present Big Dave Dugas Little Dave Dugas Betsy Dugas Lauren Dugas David Jarvis Mike Sutton Bennie Jarvis Faith Jarvis Glenn Jarvis Will Jarvis Time Spent 4 hours 4 hours 4 hours 4 hours 4 hours 4 hours 4 hours 4 hours 4 hours 4 hours Friday October 3rd

  27. Friday October 3rd cont. Today we cut back the roof deck boards at the overhang and installed nailers. We used a 26’ scissor lift, 4 sections scaffolding, 2 baker scaffolds, 4 8’ ladders, a 5,000 watt generator, 2 power miters, 1 Skil Saw and hand tools.

  28. People Present Big Dave Dugas Little Dave Dugas David Jarvis Will Jarvis Mike Sutton Tracy Smith Travis Smith Betsy Dugas Bennie Jarvis Faith Jarvis Lauren Dugas Time Spent 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 10 hours 6 hours 6 hours 6 hours 6 hours Saturday October 4th