Water Wall Turbine

Water Wall Turbine. Tidal Energy for Power and Profit. The Problem. The Emerging Tidal Energy Market needs a disruptive, cost effective technology to become a major player in Renewable Energy Market Place. Water Wall Turbine Disruptive Technology. Technology

Download Presentation

Water Wall Turbine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water WallTurbine Tidal Energy for Power and Profit

  2. The Problem The Emerging Tidal Energy Market needs a disruptive, cost effective technology to become a major player in Renewable Energy Market Place

  3. Water Wall Turbine Disruptive Technology • Technology • HighlyEfficient Energy Extraction • Low Installation Costs • Low Energy Production Cost • Absolute Eco- and Bio-friendliness • Construction & Installation Simplicity • No long term effect on Habitats • Scalable 500kW, 1MW, 2MW, 5MW, 10MW • Single or Multiple installations • Float technology channels & accelerates current • Harvests both Potential and Kinetic Energy • Fully assembled turbinefloated to the site • Deep or shallow waters operation • Bi- or Mono-Directional (Tidal or River Currents) • International IP patents

  4. Two important market segments for WWT: Diesel Generation Displacement 200,000 units world wide for remote communities On-Grid Connection Predictable clean energy Market Opportunity

  5. Market Development Plan • Step 1 – First Commercial Site • Remote Private Fishing Lodge • ROI based on diesel displacement • 1 MW Turbine • Step 2 – Other Remote Communities • Based on first installation success • Minimum 2 other units in the area • 1 – 2 MW Turbines • Step 3 – On-Grid Project • Approved on-grid site • 2 MW Turbine • Generate $1 million per year in sales to Utility • Step 4 – International Sales • Develop sales plan / international licensing • Many prospects already awaiting initial results

  6. Product • Product answers the need for low cost, predictable clean energy • Development Status • Detailed design complete • 1:6 scale model ocean testing • Initial site approvals complete • First customer committed based on successful installation systems test

  7. Key competitive edge: Low cost development use of well-established wind components all power train components are surface mounted Low life cycle costs Ease of operation and maintenance on secure floating platform Industry-leading energy extraction efficiency Low cost of electricity (10 -15 cents per kWh) Competitive Edge

  8. Financial Forecast • World Market comprises Tidal and River Streams for either remote power, diesel displacement and on-grid operation in multiple arrays. • With 200,000 commercial diesel units installed world wide, an estimated 1% are near a fast moving current. • Multi-array systems in large tidal areas are expected • From inquiries to-date, an estimate of 20 units with in the first 2 years of operation are expected. • Total units expected over 5 years in excess of 200 units. • At a cost of $2,000,000 per MW produced, the total sales could realistically reach $400 million

  9. Team • Management Team • Marek Sredzki – Founder • CEO, Power Plant Engineering & Management • Lodewyk Botha - Founder • CTO, Power Plant Design • Russell Baker • Business and Marketing Consultant

  10. Milestones • Completed detailed design, site location selection and analysis, ocean testing of 1:6 scale model and approvals for first installation – Spring 2013 • Require final anchoring and power train design, construction to be completed for 1st Quarter 2014. • Deployment and Installation to be completed 2nd Quarter 2014. • Parallel construction of second location to begin during 2nd Quarter 2014

  11. Asset Highlights • Disruptive Technology • Low Cost / High Efficiency Energy • Large market – Remote and On-Grid • Matching Government Financing

  12. Water WallTurbine Tidal Energy for Power and Profit