1 / 11

Daily operation report May08-09 , 200 4

HT-7. ASIPP. Daily operation report May08-09 , 200 4. Operation team II 胡立群 ,沈飙,林士耀,李亚东 周倩,程永飞, 孙有文, 李聪. HT-7. ASIPP. Total shots: #67192---- #67370. Schedule Long pulse LHCD plasma PSI issues. HT-7. ASIPP. Vacuum and Wall. 内衬烘烤 30 A ,T > 110 0 C, limiter 30~300 0 C

wendi
Download Presentation

Daily operation report May08-09 , 200 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HT-7 ASIPP Daily operation report May08-09, 2004 Operation team II 胡立群,沈飙,林士耀,李亚东 周倩,程永飞, 孙有文, 李聪

  2. HT-7 ASIPP Total shots: #67192----#67370 • Schedule • Long pulse LHCD plasma • PSI issues

  3. HT-7 ASIPP Vacuum and Wall • 内衬烘烤 30A,T>1100C, limiter 30~3000C • 内真空 2-3E--5Pa, 外真空 6E-4Pa • Tt=4100-4250A • 西低温泵再生 6:30-- • LHCD power for Long pulse plasma: P  360KW, 110-130kA/ne3=1.0 • PSI issues: #67306----#67332 (0:40—3:50) • Typical shots ( >8 seconds) 67250(8.43s), 67251(8.92s), 67258(8.34s), 67261(8.13s) 67262(8.1s), 67263(8.42s), 67280(8.77s), 67281(8.31s) 67282(8.58), 67283 (8.34s), 67285(8.5s),67289(8.11s)

  4. HT-7 ASIPP Ip=133kA, ne3>1.0, 340kW LH

  5. HT-7 ASIPP

  6. HT-7 ASIPP Ip=110-120kA / Ne>1.0 / 290kW IBW

  7. HT-7 ASIPP 其他 • 极向场:基本正常 • 采集和显示:正常 • 真空:一台低温泵凌晨再生 • 泵最佳再生时间? • Limiter cooling:流量计电磁阀修复 • 限制器温度采集4块采集板损坏 • PLHI and PLHR • Low wall recycling at initial phase • Sensitive initial density

More Related