An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eastern Africa Power Pool(EAPP) SESSION 3: OVERVIEW

  2. Content of the overview • Power members • Key activities undertaken so far • Key activities planned • Specific projects

  3. Power Pool Members • Burundi, • DRC, • Egypt, • Ethiopia, • Kenya, • Rwanda and • Sudan. Total actual population: 310 Mio

  4. Power Pool Overview (I) • Pool set up in February 24th, 2005; • EAPP is special institution of COMESA for electrical Energy • Main objective: To make available for the Eastern Africa Region an affordable and reliable electricity, by pooling together all available electrical energy resources in the Region in an optimised and coordinated manner, in order to increase the access rate to electricity by the population of the Region and thereby promote regional integration; • Key activities undertaken so far: • EAPP Strategic Plan: financing pledged by EC-Energy Facility; EC-appraisal mission completed in November 2006; • Capacity building: financing pledged by EC-Energy Facility and by AfDB; EC and AfDB-appraisal missions completed in November 2006; • EAPP Master Plan: financing pledged by AfDB; AfDB-appraisal mission completed in November 2006; • Data base and power market rules: financing pledged by EC-Energy Facility; EC-appraisal mission completed in November 2006;

  5. Power Pool Overview (II) • Next key activities planned: • Lessos (Kenya) to Jinja (Uganda) transmission project: duplication of the existing 132 kV line with a parallel 230 km and 230 kV line;FS expected to complete in the second quarter of 2007; • Mbara (Uganda) to Kigali (Rwanda) transmission project:135 kmand 220kV line; FS expected to complete in the second quarter of 2007; • Ethiopia-Kenya Interconnection:1200 km and 400 kV line; FS will start in the second Quarter of 2007; • Rwanda-Burundi interconnection:109 km and132 kVline; FS expected to complete in the second quarter of 2007; • Ethiopia-Sudan-Egypt Interconnection: FS expected to complete in the 1st quarter of 2007; • Zambia-Tanzania-Kenya interconnection: 250 km of 220 kV and 670 km of 330 kV; FS completed; Agreements-Negotiations between countries still ongoing; • Rusizi III Power Plant: 82 MW-200MW hydro between Rwanda and DRC; PFS completed; • Gil Gilbe III Power Plant: 870 MW hydro (Ethiopia); Construction ongoing; EPC-Contract;

  6. Upcoming Key Projects in Pool Area (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 Lssos (Kenya) to Jinja (Uganda) transmission project with 230 km and 230 kV line. KENYA UGANDA ? FS expected to complete in the 2nd quarter of 2007. TRANS 2 Mbara (Uganda) to Kigali (Rwanda) transmission Project 135 km and 220 kV line. UGANDA RWANDA TRANS ? FS expected to complete in the 2nd quarter of 2007. 3 Ethiopia-Kenya Interconnection:1200 km and 400 kV line ETHIOPIA KENYA TRANS ? FS expected to complete in the 2nd quarter of 2007. 4 Rwanda-Burundi interconnection: 109 kmand 132 kV line RWANDA BURUNDI TRANS ? FS expected to complete in the 2nd quarter of 2007. (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  7. Upcoming Key Projects in Pool Area (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 Ethiopia-Sudan-Egypt Interconnection: ETHIOPIA SUDAN EGYPT TRANS ? FS expected to complete in the 1st quarter of 2007 6 Zambia-Tanzania-Kenya interconnection ZAMBIATANZANIAKENYA TRANS ? Negotiations between countries still ongoing. 7 Up grading of the existing110 kV aand 70 kV transmission systems between Rwanda, Burundi and East DRC BURUNDIRWANDADR CONGO TRANS ? FS expected to complete in the 2nd quarter of 2007. 8 Rusizi III Power Plant: 82 MW hydro between Rwanda and DRC; PFS completed BURUNDIRWANDADR CONGO TRANS ? PFS completed; financing of the FS required (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  8. THANK YOU