1 / 8

Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet

Blue Tech & Blue Economy Summit. Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8 sec (121m) Composite concrete floats Hydraulic power take-off Cylinder support structure TBD

webb
Download Presentation

Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Blue Tech & Blue Economy Summit Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8 sec (121m) Composite concrete floats Hydraulic power take-off Cylinder support structure TBD 28 kW/m average output 60 kW/m (?) rating

  2. Blue Tech & Blue Economy Summit ~1/6th scale “Rho-Cee” being prep’d for absorption test at Ohmsett facility

  3. Blue Tech & Blue Economy Summit Generic ρC – Scalable: L ~ T2 Three one/third Octave Bands dimensions in feet

  4. Blue Tech & Blue Economy Summit

  5. Blue Tech & Blue Economy Summit Yearly Cost Function – very preliminary $/m3 reinforced concrete structure maintenance bulkheads $/m = 2400 + 2500 [ 17.07(Tm/Tr)4 + 38.25(Tm/Tr)2] x 0.08 +1500*kW x 0.133 partitions structure @ 5.5% for 20 yrs PTO @ 5.5% for 15 yrs for average input power Tm, max band period Tr, ref T, here 12.5 sec PTO & WEC structure alone

  6. Blue Tech & Blue Economy Summit

  7. Blue Tech & Blue Economy Summit Extending the Wind Turbine support provided by the PSP “span”: 1040m; WT spacing: 200m (extendable-leeward); rotor diameter: 90m; ρC length: 1200m WT rating: 3MW; ρC rating: 30kW/m; 200m dock; struts: 200m x 15’ concrete culvert pipe, w/rails estimated total “foundation” cost: $1677/kW calm calm ρC / PSP Total Power Rating: 72MWWAG Total Cap Cost Est: $300M Waves, Wind ± 60° PE Storage: ~12MW-Hr, cold

  8. Blue Tech & Blue Economy Summit A Possible Arrangement of 3 - 1km floating Rho-Cee WEC Breakwaters to Protect the Columbia River Bar Passage (subject to many considerations) (Note: The scale on the chart appears bogus!) Produced energy to pay for the project !