slide1
Download
Skip this Video
Download Presentation
WiFi Project Updates

Loading in 2 Seconds...

play fullscreen
1 / 6

WiFi Project Updates - PowerPoint PPT Presentation


  • 123 Views
  • Uploaded on

WiFi Project Updates. (P17870) WiFi Vendor Comparison and RFP. Program Agenda. (P17870) WiFi Vendor Comparison and RFP Authentication re-design Roll out plan – Complete FY13 budget $1.7M FY14 budget $3.5M FY15 budget $2.6M. WiFi RFP Update - (P17870) WiFi Vendor Comparison and RFP.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' WiFi Project Updates' - warren-hines


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
wifi project updates

WiFi Project Updates

(P17870) WiFi Vendor Comparison and RFP

program agenda
Program Agenda
  • (P17870) WiFi Vendor Comparison and RFP
  • Authentication re-design
  • Roll out plan – Complete
    • FY13 budget $1.7M
    • FY14 budget $3.5M
    • FY15 budget $2.6M
wifi rfp update p17870 wifi vendor comparison and rfp
WiFi RFP Update - (P17870) WiFi Vendor Comparison and RFP
  • RFP complete as of 04-May-2012
  • Rollout plan complete and communicated
  • Access point placement training complete
  • Hardware STR applied for – expected 11-OCT-2012
  • Engineering Package for controllers – Complete and approved, additional engineering package for the actual installation needs to be completed
  • Controller purchase requisitions are placed – Installed and working HQ,ADC,RMDC,JAPAN, SG-almost complete. EMEA,AU,India may have to wait until after freeze.
  • Controller installation guide – completed (12-Oct-2012)
  • Complete pilot sites – in work
  • Change existing WiFi hardware standards for other locations – Complete
  • Work with authentication and management team on new design and start pilot – in work
  • Order other infrastructure components - this includes authentication and management system components
  • Authentication design package into CSARB and STR – in work
  • Authentication design package into technical review
  • Change WiFi design standard
  • Order authentication and management equipment
  • Install authentication and management equipment
  • Implement new authentication method into production