Petr Grygarek VSB-CZ. WP3 Semivirtual Campus Progress Report. What was done by WP3 (from last meeting in Bern) ‏. * Working with individual partners on integration of their labs into SVC * CP Usage manual screenshot guide

Download Presentation

WP3 Semivirtual Campus Progress Report

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Petr grygarek vsb cz

Petr Grygarek

VSB-CZ

WP3Semivirtual CampusProgress Report


Wp3 semivirtual campus progress report

What was done by WP3

(from last meeting in Bern)‏

* Working with individual partners on integration of their labs into SVC

* CP Usage manual screenshot guide

- http://edinet.cs.vsb.cz/images/9/98/EdinetCP-step-by-step-guide.pdf

- describes basic operations for admins and students

* User filters on PreconfigImpl reservations* Some testing tools for SVCAdmin added

- buttons for immediate initiation of VPN tunnels to partners' labs

- ability to view/edit other labs' device management interfaces definitions


Remaining actions needed to finish svc integration 1 state current on march 6 as known to wp3

Remaining actions needed to finish SVC integration (1)(state current on March 6 as known to WP3)‏

  • ALL:

    • Place the task to the CP

      • create PreconfigImpl & PreconfigDescr

      • insert task assignment text

      • advertise task on the noticeboard)

    • Finish the configuration cleaning system ASAP

    • Check the proper operation of local Shibboleth IdP

      • WP3 have no chance do test it centrally

    • Preconfigure hostnames to devices wherever possible to simplify further testing


Remaining actions needed to finish svc integration 2 state current on march 6 as known to wp3

Remaining actions needed to finish SVC integration (2)(state current on March 6 as known to WP3)‏

  • AT:

    • Place the task to the CP

    • Correct port numbers at Device managements configuration on CP (500x instead of 300x).

    • Preconfigure devices' hostnames

    • Finish the configuration cleaning system ASAP

  • IT-FI

    • Finish the configuration cleaning system ASAP

  • HSB-DE:

    • Place the task to the CP.

    • Decide how to handle Security Game WWW server accounts for Edinet users (1 account for all users ?)‏

    • Decide how to organize groups of users sharing the game


Remaining actions needed to finish svc integration 3 state current on march 6 as known to wp3

Remaining actions needed to finish SVC integration (3)(state current on March 6 as known to WP3)‏

  • SK:

    • Define device managements on CP and describe the device management addresses/ports on WP3 Wiki.

    • Not devices are reachable at 10.3.1.1/500x.

    • The lab description at WP3 Wiki is somewhat messy - there are 4 routers on the picture, but only 3 routers mentioned at in the text window.

    • Place the task to the CP.

    • Finish the configuration cleaning system ASAP

  • CH:

    • Place the task to the CP.

    • Add the list of the device management interfaces to WP3 Wiki.

    • Finish the configuration cleaning system ASAP.


Non wp3 todo and open questions 1

Non-WP3 TODO and open questions (1)‏

  • WP6: Instructions for organizing the whole piloting (including timing and outputs) needed

    • Will we have some technical testing period (who will do the testing ?) or just let the piloting students enter the SVC in “as is” state ? (consider the lack of time)‏

    • Which partner will test which module(s)‏ ?

  • How to protect network devices from misconfiguration/damage ?

    • Protection not identified as a need during the SVC requirement definition phase

  • WP6: Bugtracking system – define overall usage guidelines

    • Define bug processing workflow, name the person responsible for account creation, …

    • VSB-CZ suggestions may be used


Non wp3 todo and open questions 2

Non-WP3 TODO and open questions (2)‏

  • WP1: Are online piloting questionaries ready to collect data ?

  • WP2: Collect the final versions of the lab tasks and distribute them among other partners ASAP

    • needed for partners to decide how to incorporate other partners' tasks into currently taught subjects for the for purpose of Edinet piloting

    • Partners have to place final task's versions to the CP also


  • Login