Develop Base Conditions and Models. Plan Formulation and Evaluation. Design Selected Plan. Conduct NEPA Scoping Activities Identify Objectives and Constraints Inventory Resources Develop Simulation Models (Hydrologic, Ecologic, Water Quality)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Prepare PMP' - vlad


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Develop BaseConditions and Models

Plan Formulation and Evaluation

Design SelectedPlan

  • Conduct NEPA Scoping Activities
  • Identify Objectives and Constraints
  • Inventory Resources
  • Develop Simulation Models
  • (Hydrologic, Ecologic, Water
  • Quality)
  • Identify Performance Measures
  • Define Existing Conditions
  • Define Without Plan Conditions
  • Initiate Data Collection
  • Define Measures (Components)
  • Develop Planning Cost Estimates (Real Estate, Construction, O&M)
  • Evaluate Measures (compare with and without plan conditions)
  • Conduct Incremental Cost
  • Analysis
  • Compare Alternative Plans
  • Conduct Environmental
  • Assessments
  • Prepare Engineering Design
  • Develop Draft Water Control Plan
  • Prepare Real Estate Gross
  • Appraisal
  • Prepare MCACES Cost Estimate
  • Quantify Water Made Available
  • Identify Water to be Reserved
  • Conduct Interim Operations
  • Assessment
  • Develop Project Level Monitoring Plan

RECOVER

RECOVER

RECOVER

  • Assist in Development of Existing
  • and Without Plan Conditions
  • Assist in Development of
  • Performance Measures
  • Conduct System-Wide
  • Evaluation of Plans
  • Assist in Optimization of Plan
  • Performance for System-Wide
  • Benefits
  • Assist in Development of Draft Water
  • Control Plan
  • Coordinate Project Level Monitoring
  • with System-Wide Monitoring Plan

TYPICAL PIR PROCESS

Issues & Recommendations

Pre-ApplicationConference

DraftCAR

IPR

FSM

IPR

PAL

AFB

PrepareDraftPIRw/NEPADocument

TentativelySelectedPlan

Prepare PMP

InitiatePIR

FinalCAR

DEPReview and Approval

SponsorLetter ofIntent

30 DayState & AgencyReview

DENotice

FWS

Corps

Public andAgencyReviewof DraftPIR

WashingtonLevelReviewof PIR

Release Draft PIR

PrepareFinal PIRw/NEPADocument

ReleaseFinalPIR

Chief ofEngineersReport

Review byASA (CW)andOMB

RODSigned

TransmitPIRtoCongress