Fort Nelson Progress Pictures Week 16. Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10. Fort Nelson Progress Pictures. Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars. Fort Nelson Progress Pictures.

Download Presentation

Fort Nelson Progress Pictures Week 16

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fort nelson progress pictures week 16

Fort Nelson Progress Pictures Week 16

  • Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10


Fort nelson progress pictures

Fort Nelson Progress Pictures

  • Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars.


Fort nelson progress pictures1

Fort Nelson Progress Pictures

  • Gas meter house demolished, foundation excavated from C1 – C5 and 50% blinded, 3no column bases excavated


Fort nelson progress pictures2

Fort Nelson Progress Pictures

Water tank downstand beams poured, tanks sanded up and insulation and volclay installed.


Fort nelson progress pictures3

Fort Nelson Progress Pictures

2no underpins excavated and poured.