Fort Nelson Progress Pictures Week 16. Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10. Fort Nelson Progress Pictures. Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars. Fort Nelson Progress Pictures.

Download Presentation

Fort Nelson Progress Pictures Week 16

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fort Nelson Progress Pictures Week 16

  • Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10


Fort Nelson Progress Pictures

  • Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars.


Fort Nelson Progress Pictures

  • Gas meter house demolished, foundation excavated from C1 – C5 and 50% blinded, 3no column bases excavated


Fort Nelson Progress Pictures

Water tank downstand beams poured, tanks sanded up and insulation and volclay installed.


Fort Nelson Progress Pictures

2no underpins excavated and poured.