Mantoloking & Super Storm Sandy

Loading in 2 Seconds...

play fullscreen
1 / 14

Mantoloking & Super Storm Sandy - PowerPoint PPT Presentation


  • 148 Views
  • Uploaded on

Mantoloking & Super Storm Sandy. Update #3. Mantoloking & Super Storm Sandy. AGENDA : Overview Current Status Short-Term Plan Long-Term Plan Resources. 2. Mantoloking & Super Storm Sandy – Current Status. INFRASTRUCTURE: STATE DOT Project : Finished

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Mantoloking & Super Storm Sandy' - vidal


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

Mantoloking & Super Storm Sandy

  • AGENDA:
  • Overview
  • Current Status
  • Short-Term Plan
  • Long-Term Plan
  • Resources

2

slide3

Mantoloking & Super Storm Sandy – Current Status

  • INFRASTRUCTURE:
  • STATE DOT Project:
  • Finished
  • Working traffic light on Herbert
  • Guardrails in place
  • Sidewalks, curbs, grass (!?!)
slide4

Mantoloking & Super Storm Sandy – Current Status

  • INFRASTRUCTURE:
  • DEBRIS REMOVAL:
  • 26,000 tons to date
  • Continuous
  • Private Property Debris Removal (including demolition) under discussion
  • with FEMA.
  • SAND REMOVAL/RE-USE:
  • Army Corps dredging Lyman
  • Temporary sifting station will be in place immediately after dredge work is complete.
slide5

Mantoloking & Super Storm Sandy – Short-Term Plan

  • Access:
  • New Access System in place
  • Priority: First Responders / Residents
  • Contractors next
slide6

Mantoloking & Super Storm Sandy – Short-Term Plan

  • Administration:
  • Tax reassessment- Complete assessment by Property by March, 2013
  • Prepare for Reconstruction: Planning Board considering new zoning req’s based on revised elevation guidelines from FEMA (issued last week)
  • Streamline permit process
  • Planning Board working with Borough: Resolution being drafted allowing: PODs, RVs, Boats, etc.
slide7

Mantoloking & Super Storm Sandy

  • UTILITIES (Current Status):
  • Sanitary Sewer
  • Over 15,000 lf (3 miles) of sewer main cleaned and inspected
  • Force main pressurized and discharging clean water to OCUA
  • Water
  • 90% of main restoration complete
  • Pressure testing and water quality testing for 8” main on Rt. 35
  • Gas
  • 70% of main restoration complete
  • Portion of Barnegat Lane and Lagoon/Channel not pressurized
  • Electric
  • 85% of distribution grid energized
  • Areas around Barnegat Lane and Herbert St breach not energized

7

slide8

Mantoloking & Super Storm Sandy

  • UTILITIES (Short Term Planning):
  • Sanitary Sewer
  • Complete the remainder of sewer main CCTV inspection/cleaning
  • Install temporary pump system at Herbert Street
  • Water
  • Repair damaged fire hydrants
  • Install new services for properties off of new 8” main in Rt 35
  • Gas
  • Pressurize and perform full assessment of Lagoon/Channel area
  • Replace 2” main on Barnegat Lane
  • Electric
  • Complete the replacement of overhead distribution
  • Ensure safety policies remain in place throughout restoration work