1 / 4

D-PVM-DS-23 Dell PowerMax and VMAX Family Solutions Design 2023 Dumps

With the latest D-PVM-DS-23 Dell PowerMax and VMAX Family Solutions Design 2023 Dumps, exclusively cracked by the expert team at Passcert, you can now enhance your chances of acing the exam with ease.

Download Presentation

D-PVM-DS-23 Dell PowerMax and VMAX Family Solutions Design 2023 Dumps

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Download Valid D-PVM-DS-23 Exam Dumps For Best Preparation Exam : D-PVM-DS-23 Title : Dell PowerMax and VMAX Family Solutions Design 2023 https://www.passcert.com/D-PVM-DS-23.html 1 / 4

  2. Download Valid D-PVM-DS-23 Exam Dumps For Best Preparation 1.A storage administrator uses Unisphere for PowerMax to provision new storage from a VMAX All Flash array. Which Workload Type is recommended for a combination of small and large block I/O workloads? A. DSS B. Optimized C. OLTP D. None Answer: D 2.Match each SnapVX term to its description. Answer: 3.An architect uses the following command to collect data from a host when designing a solution in BCSD: iostat –d –x –t interval count >> hostname.iostat.date.txt What does the -x flag in the command represent? A. Expanded format B. Exclude space characters C. Extended format D. XML format Answer: C 2 / 4

  3. Download Valid D-PVM-DS-23 Exam Dumps For Best Preparation 4.How do Copy mode linked targets and NoCopy mode linked targets behave when a SnapVX unlink operation disassociates the linked target? A. Once the copy completes, Copy mode linked targets do not contain a full and usable copy of the source devices. Behavior of NoCopy mode linked targets depends on the operating system running on the array. PowerMaxOS 5978 and HYPERMAX OS 5977.810.184 and later allow access to unlinked targets. B. Once the copy completes, Copy mode linked targets contain a full and usable copy of the source devices. Behavior of NoCopy mode linked targets depends on the operating system running on the array. PowerMaxOS 5978 and HYPERMAX OS 5977.596.583 and later allow access to unlinked targets. C. Once the copy completes, Copy mode linked targets contain a full and usable copy of the source devices. Behavior of NoCopy mode linked targets depends on the operating system running on the array. PowerMaxOS 5978 and HYPERMAX OS 5977.810.184 and later allow access to unlinked targets. D. Once the copy completes, Copy mode linked targets will contain a full and usable copy of the source devices. NoCopy mode linked targets will not allow access to unlinked targets. Answer: B 5.Which PowerMax initially ordered configuration provides the fewest available slots for front-end I/O modules per engine? A. PowerMax 2000 dual-engine B. PowerMax 8000 multi-engine C. PowerMax 2000 single-engine D. PowerMax 8000 single-engine Answer: D 6.An administrator is managing historical performance data retention in Unisphere for PowerMax. Which unit of time is associated with the numerical value they specify for the retention period? A. Months B. Hours C. Days D. Weeks Answer: A 7.By what percentage is SRDF throughput improved by SiRT? A. 10% B. 20% C. 30% D. 40% Answer: B 8.What is the best practice sizing guideline for front-end FA utilization on a single engine PowerMax array? 3 / 4

  4. Download Valid D-PVM-DS-23 Exam Dumps For Best Preparation A. 0.5 B. 0.7 C. 0.8 D. 0.6 Answer: A 9.What is the maximum number of BTP files that can be included in a project in Sizer? A. 40 B. 30 C. 10 D. 20 Answer: B 10.What is the best practice sizing guideline for front-end FA utilization on a two-engine PowerMax array? A. 0.5 B. 0.6 C. 0.7 D. 0.8 Answer: C 11.In a legacy SRDF/A mode, the delta sets are numbered as follows: Capture: N, Transmit: N-1, Receive: N-1, Apply: N-2 What is the number of the Transmit Delta Set after the second cycle switch? A. N+2 B. N C. N-1 D. N+1 Answer: D 12.Which of the following is TRUE about a COMMIT statement executed at the end of the T1 unit of work? A. A ROLLBACK command executed just after the COMMIT command cancels that COMMIT B. Save points defined during transaction T1 are released only if there is a RELEASE SAVEPOINT command executed after the COMMIT command C. It finishes the current T1 unit of work and a new one is initiated, however it is possible to ROLLBACK to the latest SAVEPOINT before COMMIT D. It finishes the current T1 unit of work and a new one is initiated. All changes made by UPDATE and DELETE commands during unit of work T1 are committed Answer: D 4 / 4

More Related