determination of upperbound failure rate by graphic confidence interval estimate
Download
Skip this Video
Download Presentation
Determination of Upperbound Failure Rate by Graphic Confidence Interval Estimate

Loading in 2 Seconds...

play fullscreen
1 / 14

Determination of - PowerPoint PPT Presentation


  • 329 Views
  • Uploaded on

LAUR-01-1671. Determination of Upperbound Failure Rate by Graphic Confidence Interval Estimate. K. S. Kim (Kyo) Los Alamos National Laboratory Los Alamos, NM 87545 E-mail: [email protected] Kim-1.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Determination of' - victoria


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
determination of upperbound failure rate by graphic confidence interval estimate

LAUR-01-1671

Determination ofUpperbound Failure RatebyGraphic Confidence Interval Estimate

K. S. Kim (Kyo)

Los Alamos National Laboratory

Los Alamos, NM 87545

E-mail: [email protected]

Kim-1

slide2

If you believe that selecting Power Ball numbersis a random process, that is, a Poisson process,then your chance of winning is 1 in 1000000.

But considering your horoscope today and invokingthe Bayesian theorem, your chance can be 1 in 5.Of course, there are sampling errors of plus-minus….

Gee, I wonder whatis the odd of gettingmy money back

Kim-2

doe hazard analysis requirement

LAUR-01-1671

DOE Hazard Analysis Requirement
  • DOE Order 5480.23 requires Hazard Analysis for all Nuclear Facilities
  • Hazard Analysis entails estimation of Consequence and Likelihood (or Frequency) of potential accidents
  • Potential Accidents are “Binned” according to Consequence & Frequency for determination of further analysis and necessary Controls
  • DOE-STD-3009 provides Example for Binning
  • LANL Binning Matrix (risk matrix)

Kim-3

method for frequency determination

LAUR-01-1671

Method for Frequency Determination
  • Historical Record of Event Occurrence (number of events per component-time or N/C*T)
    • A simple division of N/C*T ignores uncertainty (1 event in 10 component-yrs and 100 events per 1,000 component-yrs would be represented by the same frequency value of 0.1/yr)
    • Not useful for a type of accident that has not occurred yet (Zero-occurrence events)
  • Fault Tree/Event Tree Method (for PRA) can be used for Overall Accident Likelihood: Historical record is used for estimation of initiating event frequency or component failure rate/frequency

Kim-5

statistical inference primer

LAUR-01-1671

Statistical Inference Primer
  • Typical occurrences of failure (spill, leaks, fire, etc.) are considered as random discrete events in space and time (Poisson process), thus Poisson distribution can be assumed for the Failure Rate (or Frequency)
  • Classical Confidence Intervals have the property that Probability of parameters of interest being contained within the Confidence Interval is at least at the specified confidence level in repeated samplings
  • Upperbound Confidence Interval for Poisson processcan be approximated by Chi-square distribution function

U (1-P) is upper 100(1-P)% confidence limit (or interval) of ,

P is exceedance probability,

2(2N+2; 1-P) is chi-square distribution with 2N+2 degrees of freedom

Kim-6

graphic method

LAUR-01-1671

Graphic Method
  • Zero-occurrence Events
  • Nonzero-occurrence Events

Kim-8

examples

LAUR-01-1671

Examples
  • Upperbound frequency estimate of a liquid radwaste spill of more than 5 gallons for a Preliminary Hazard Analysis (desired confidence level is set as 80% or exceedance probability of 0.2). No such spill has been recorded for 3 similar facilities in 10 years.
  • Upperbound frequency estimate of a fire lasting longer than 2 hours for Design Basis Accident Analysis (desired confidence level is set as 95% or exceedance probability of 0.05). Four (4) such fires have been recorded in 5 similar facilities during a sampling period 12 years.

Kim-11

zero occurrence events12
Zero-occurrence Events

LAUR-01-1671

(No occurrence for 3 components in 10 years, 80% Confidence Interval)

C=3, T=10 yr

U (80%)= Z/C*T

=1.6/30

=0.053 /yr

Spill frequency is less than

0.053/yr with 80% confidence

Z=1.6

Kim-12

nonzero occurrence events 4 occurrences for 5 components in 12 years 95 confidence interval
Nonzero-occurrence Events(4 occurrences for 5 components in 12 years, 95% Confidence interval)

LAUR-01-1671

N=4, C=5, T=12 yrs

U(95%) = R*(N/CT)

= 2.3*0.067

= 0.15/yr

Fire frequency is less than 0.15/yr

with 95% confidence

R=2.3

N=4

Kim-13

concluding remarks
Concluding Remarks

LAUR-01-1671

  • Setting Confidence Level depends on analysts
  • Higher Level for events with sparse historical data (infrequent or rare events)
  • Higher Level for Conservative Design Analysis (95% for DBA)
  • Lower Level for expected or best estimate analysis (50%)

Kim-14