Buckeye frs no 1 rehabilitation project
Download
1 / 16

Buckeye FRS No.1 Rehabilitation Project - PowerPoint PPT Presentation


  • 63 Views
  • Uploaded on

Buckeye FRS No.1 Rehabilitation Project. Tom Renckly, P.E. Branch Manager Structures Management Branch. Flood Control Dams. Dam Safety Program. Recurrent Dam Safety Structures Assessment and Repairs Dam Rehabilitation. Buckeye FRS No. 1 looking west.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Buckeye FRS No.1 Rehabilitation Project ' - vernon-fletcher


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Buckeye frs no 1 rehabilitation project

Buckeye FRS No.1Rehabilitation Project

Tom Renckly, P.E.

Branch Manager

Structures Management Branch



Dam safety program
Dam Safety Program

  • Recurrent Dam Safety

  • Structures Assessment and Repairs

  • Dam Rehabilitation

Buckeye FRS No. 1 looking west


Buckeye frs no 1 rehabilitation project background
Buckeye FRS No.1 Rehabilitation ProjectBackground

  • Earthfill Flood Retarding Structure (FRS)

  • Constructed by SCS (NRCS) 1974 and Modified in 1980

  • Operated & Maintained by FCDMC

  • ADWR is Regulatory Agency

  • Crest Length is 7.1 miles

  • Height is 26 ft.

Buckeye FRS No. 1


Buckeye frs no 1 rehabilitation project buckeye watershed project
Buckeye FRS No.1 Rehabilitation ProjectBuckeye Watershed Project



Buckeye frs no 1 rehabilitation project outlets for dams
Buckeye FRS No.1 Rehabilitation ProjectOutlets for Dams

30” Pipe Outlet

60” Pipe Outlet

48” Pipe Outlet



Buckeye frs no 1 rehabilitation project emergency spillways
Buckeye FRS No.1 Rehabilitation ProjectEmergency Spillways

Emergency Spillway


Buckeye frs no 2 emergency spillway
Buckeye FRS No.2 Emergency Spillway


Buckeye frs no 1 rehabilitation project transverse cracks investigation and repair
Buckeye FRS No.1 Rehabilitation ProjectTransverse Cracks Investigation and Repair


Buckeye frs no 1 rehabilitation project alternatives analysis study
Buckeye FRS No.1 Rehabilitation ProjectAlternatives Analysis Study

  • Correct Dam Safety Deficiencies

  • Identify Opportunities for:

    • Incorporate Multi-use for the Community

    • Improved Landscaping and Aesthetics

    • Enhance Environment

    • Public and Stakeholder Involvement


Buckeye frs no 1 rehabilitation project alternatives analysis study continued
Buckeye FRS No.1 Rehabilitation ProjectAlternatives Analysis Study (continued)

  • Possible Alternatives

    • Floodway and Levee

    • Flood Control Basins

    • Rehabilitate Dam

    • Combination


Buckeye frs no 1 rehabilitation project partners natural resources conservation service nrcs
Buckeye FRS No.1 Rehabilitation Project PartnersNatural Resources Conservation Service (NRCS)

  • Federal Workplan and Environmental Assessment

  • Dam Rehabilitation Program (PL-462: 65-35 cost share)

  • Multi-use Recreational Component (50-50 cost share)

    • District Encourages Recreational Cost Share By Others


Buckeye frs no 1 rehabilitation project partners flood control district funding
Buckeye FRS No.1 Rehabilitation Project PartnersFlood Control District Funding

  • Capital Improvement Program

  • Compete with Other Flood Control Projects


Buckeye frs no 1 rehabilitation project partners schedule
Buckeye FRS No.1 Rehabilitation Project PartnersSchedule

September

September

November

November

January

January

March

March

May

May

July

July

2008

2007

*

*

Alternatives Analysis

Planning and Pre-design

Final Design

Construction (Potentially to be phased)

TBD

* Public Meeting