Investment costs in the Virtual Test

Investment costs in the Virtual Test. GRI NW Investment I1- Virtual Test/Business Simulation. Bas Barten Gas Transport Services. Virtual pipeline through 4 countries. Germany Netherlands Belgium France. 400 km. 400 km. 400 km. 400 km. 50 bar. 50 bar. 50 bar. 50 bar.

verne
Download Presentation

Investment costs in the Virtual Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services

  2. Virtual pipeline through 4 countries Germany Netherlands Belgium France 400 km 400 km 400 km 400 km 50 bar 50 bar 50 bar 50 bar 50 bar

  3. Virtual pipeline through 4 countries Germany Netherlands Belgium France 400 km 400 km 400 km 400 km 50 bar 50 bar 50 bar 50 bar 50 bar 50 bar 80 bar

  4. Investment costs for 48 inch Yearly volume transported: 20 bcm Capacity@7400 hours LF: 2,7 mln Nm3/h CAPEX per country: 400 km 48 inch pipeline = 800 mln EUR 3 compressor stations ( each 35 MW) = 300 mln EUR Total CAPEX per country = 1,1 billion EUR OPEX per country: OPEX for pipe and compressors = 21 mln EUR/year Fuel cost for compressors = 67 mln EUR/year (7400 running hours per year)

  5. Investment costs for 48 inch (36 inch) Yearly volume transported: 20 bcm (10 bcm) Capacity@7400 hours LF: 2,7 mln Nm3/h (1,35 mln Nm3/h) CAPEX per country: 400 km 48 inch pipeline = 800 mln EUR (560) 3 compressor stations = 300 mln EUR (200) Total CAPEX per country = 1,1 billion EUR (760) OPEX per country: OPEX for pipe and compressors = 21 mln EUR/year (14) Fuel cost for compressors = 67 mln EUR/year (7400 running hours per year) (34)

  6. Investment costs remarks • No overhead costs or general administration only direct OPEX (e.g maintenance and operation) • Costs reflect the range of investment costs of the TSOs in the active group (+/- 40 %) excluding tax • We think more accurate estimation is unnecessary at the moment and also not possible without complex studies taken into account the exact route of the pipeline • Fuel gas at gas price of 25 EUR/MWH • Are two pipeline diameters sufficient?

  7. Investment costs for steps in between • 20 bcm and 10 bcm are at their “limit” • Other options can be expanded with adding Comp Stations