Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification ...
This presentation is the property of its rightful owner.
Sponsored Links
1 / 30

Readiness Review Course PowerPoint PPT Presentation


  • 100 Views
  • Uploaded on
  • Presentation posted in: General

Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) . Contractor Plan of Action (CPOA) Prepared. DOE Plan of Action (POA) Prepared by DOE Line Mgr. AA Reviews and Approves CPOA and POA .

Download Presentation

Readiness Review Course

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Nov 2006

Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule)

Contractor Plan of Action (CPOA) Prepared

DOE Plan of Action (POA) Prepared by DOE Line Mgr

AA Reviews and Approves

CPOA and POA

Startup Notification Report Prepared and Submitted

Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL

DOE TL Pre-Assessment Preparation and Planning (Team Selected

Initial Team Mtg

Pre-Site Visit, IP Drafted)

AA Approves SNR and Nominates DOE Team Leader (TL)

Prerequisites met (MSA)

Readiness Review Process Begins

Contractors RR and Final Report

DOE RR IP approved by TL

Corrective Action Plan (CAP) Submitted and Approved

DOE RR and Final Report

CAP Submitted and Approved

Prestart Findings Closed

Contractor Issues Readiness to Proceed (RTP)

Prestart Findings Closed

DOE Endorsement of RTP and MSA

AA Authorizes Startup

AA Authorizes Start of RR to RR TL

Readiness ReviewCourse

Facility

Scoping Meeting – Mod 3

Nov 2006


Readiness review process

Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule)

Contractor Plan of Action (CPOA) Prepared

DOE Plan of Action (POA) Prepared by DOE Line Mgr

AA Reviews and Approves

CPOA and POA

Startup Notification Report Prepared and Submitted

Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL

DOE TL Pre-Assessment Preparation and Planning (Team Selected

Initial Team Mtg

Pre-Site Visit, IP Drafted)

AA Approves SNR and Nominates DOE Team Leader (TL)

Prerequisites met (MSA)

Readiness Review Process Begins

Contractors RR and Final Report

DOE RR IP approved by TL

Corrective Action Plan (CAP) Submitted and Approved

DOE RR and Final Report

CAP Submitted and Approved

Prestart Findings Closed

Contractor Issues Readiness to Proceed (RTP)

Prestart Findings Closed

DOE Endorsement of RTP and MSA

AA Authorizes Startup

AA Authorizes Start of RR to RR TL

Readiness Review Process

1 Year

Prior to

RR

Nov 2006


Learning objectives

Learning Objectives

  • An understanding of the importance and purpose of a pre-planning or scoping meeting

    • Project Management, DOE O 413.3A, M 413.3-1

    • Facility Preparation, Planning, Timing, Verification

    • Understand the AA Selection

    • Identify Prerequisites

Nov 2006


Project management doe o 413 3a m 413 3 1

Project Management DOE O 413.3A, M 413.3-1

  • Define the work scope . . .

    • Construction, modification, support SSCs . . .

    • Equipment testing and subsequent repairs . . .

    • Documentation development-DSA, procedures, etc. . .

    • Training, qualification, surrogate operations . . .

  • Identify task relationships . . .

    • Predecessor: Procedures . . .

    • Successor: Operator Training . . .

  • Plan realistic task duration . . . Essential!

  • When changes occur, identify all affected tasks . . .

Nov 2006


Project management doe o 413 3a m 413 3 11

Project Management DOE O 413.3A, M 413.3-1

Nov 2006


Facility prep and planning

Facility Prep and Planning

  • Engineered controls in place and tested;

  • Procedures complete, V&V, CM;

  • Training complete;

  • Surveillances demonstrated and current;

  • Management programs in place:

    • Specific Administrative controls implemented and verified effective.

  • Issues and other Tracking systems functioning.

Nov 2006


Plan to achieve readiness

Plan to Achieve Readiness

  • Identify and address Core Requirements early in the schedule:

    • Prerequisites!

  • Allow time for implementation:

    • Training . . .

    • Procedure V&V . . .

    • Practice . . .

  • Can’t Start Too Early!

Nov 2006


The authorization authority aa

The Authorization Authority (AA)

  • DOE Management Official (or Designee) who approves the:

    • SNR,

    • CPOA, POA, CAPs,

    • Appointment of the DOE Team Leader,

    • Endorsement of Readiness to Proceed,

    • The startup or restart of a facility.

      (DOE O 425.1C)

Nov 2006


Doe std 3006 2000 table 1 startup and restart requirements summary

DOE-STD-3006-2000Table 1 – Startup and Restart Requirements Summary

Nov 2006


Determination of aa

Determination of AA

DOE O 425.1C Requirements

Nov 2006


Identify prerequisites

Identify Prerequisites

  • Part of Project Planning – Measurable Milestones

  • Detailed and Measurable . . .

  • Tied to Core Requirements - are they met?

  • Documented in CPOA, POA and IPs

Nov 2006


Identify prerequisites continued

Identify Prerequisites (continued)

  • Specific Startup Requirements:

    • Identify ALL SSCs including support systems;

    • Authorization and Safety Basis;

    • Operator Training Requirements Completed;

    • Procedures Finalized (V&V);

    • Test Program Complete, results approved;

    • DSA fully implemented; etc; . . .

Nov 2006


Identify prerequisites continued1

Authorization Agreement

Authorization Basis (AB)

S/RID

EIS

SER

Safety Basis

(SB)

ORR/RA

DSA

(or equivalent)

TSR, HAR, FHA,

BIO, USQ

NESS

Defined Work Scope

Special Terms & Conditions

WSS

PHA

Environmental Permits

Drawings (facility, tooling, etc.)

Technical Manuals

Engineering Calculation Notes

Contractor Safety Programs

Site S&S Plan

Emergency Preparedness Plan

Identify Prerequisites(continued)

Nov 2006


Planning for failure

Planning for Failure

Nov 2006


Questions

Questions

Nov 2006


Nov 2006

Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule)

Contractor Plan of Action (CPOA) Prepared

DOE Plan of Action (POA) Prepared by DOE Line Mgr

AA Reviews and Approves

CPOA and POA

Startup Notification Report Prepared and Submitted

Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL

DOE TL Pre-Assessment Preparation and Planning (Team Selected

Initial Team Mtg

Pre-Site Visit, IP Drafted)

AA Approves SNR and Nominates DOE Team Leader (TL)

Prerequisites met (MSA)

Readiness Review Process Begins

Contractors RR and Final Report

DOE RR IP approved by TL

Corrective Action Plan (CAP) Submitted and Approved

DOE RR and Final Report

CAP Submitted and Approved

Prestart Findings Closed

Contractor Issues Readiness to Proceed (RTP)

Prestart Findings Closed

DOE Endorsement of RTP and MSA

AA Authorizes Startup

AA Authorizes Start of RR to RR TL

Readiness ReviewCourse

Facility

Scoping Meeting – Mod 3

Nov 2006


Readiness review process1

Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule)

Contractor Plan of Action (CPOA) Prepared

DOE Plan of Action (POA) Prepared by DOE Line Mgr

AA Reviews and Approves

CPOA and POA

Startup Notification Report Prepared and Submitted

Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL

DOE TL Pre-Assessment Preparation and Planning (Team Selected

Initial Team Mtg

Pre-Site Visit, IP Drafted)

AA Approves SNR and Nominates DOE Team Leader (TL)

Prerequisites met (MSA)

Readiness Review Process Begins

Contractors RR and Final Report

DOE RR IP approved by TL

Corrective Action Plan (CAP) Submitted and Approved

DOE RR and Final Report

CAP Submitted and Approved

Prestart Findings Closed

Contractor Issues Readiness to Proceed (RTP)

Prestart Findings Closed

DOE Endorsement of RTP and MSA

AA Authorizes Startup

AA Authorizes Start of RR to RR TL

Readiness Review Process

1 Year

Prior to

RR

Nov 2006


Learning objectives1

Learning Objectives

  • An understanding of the importance and purpose of a pre-planning or scoping meeting

    • Project Management, DOE O 413.3A, M 413.3-1

    • Facility Preparation, Planning, Timing, Verification

    • Understand the AA Selection

    • Identify Prerequisites

Nov 2006


Project management doe o 413 3a m 413 3 12

Project Management DOE O 413.3A, M 413.3-1

  • Define the work scope . . .

    • Construction, modification, support SSCs . . .

    • Equipment testing and subsequent repairs . . .

    • Documentation development-DSA, procedures, etc. . .

    • Training, qualification, surrogate operations . . .

  • Identify task relationships . . .

    • Predecessor: Procedures . . .

    • Successor: Operator Training . . .

  • Plan realistic task duration . . . Essential!

  • When changes occur, identify all affected tasks . . .

Nov 2006


Project management doe o 413 3a m 413 3 13

Project Management DOE O 413.3A, M 413.3-1

Nov 2006


Facility prep and planning1

Facility Prep and Planning

  • Engineered controls in place and tested;

  • Procedures complete, V&V, CM;

  • Training complete;

  • Surveillances demonstrated and current;

  • Management programs in place:

    • Specific Administrative controls implemented and verified effective.

  • Issues and other Tracking systems functioning.

Nov 2006


Plan to achieve readiness1

Plan to Achieve Readiness

  • Identify and address Core Requirements early in the schedule:

    • Prerequisites!

  • Allow time for implementation:

    • Training . . .

    • Procedure V&V . . .

    • Practice . . .

  • Can’t Start Too Early!

Nov 2006


The authorization authority aa1

The Authorization Authority (AA)

  • DOE Management Official (or Designee) who approves the:

    • SNR,

    • CPOA, POA, CAPs,

    • Appointment of the DOE Team Leader,

    • Endorsement of Readiness to Proceed,

    • The startup or restart of a facility.

      (DOE O 425.1C)

Nov 2006


Doe std 3006 2000 table 1 startup and restart requirements summary1

DOE-STD-3006-2000Table 1 – Startup and Restart Requirements Summary

Nov 2006


Determination of aa1

Determination of AA

DOE O 425.1C Requirements

Nov 2006


Identify prerequisites1

Identify Prerequisites

  • Part of Project Planning – Measurable Milestones

  • Detailed and Measurable . . .

  • Tied to Core Requirements - are they met?

  • Documented in CPOA, POA and IPs

Nov 2006


Identify prerequisites continued2

Identify Prerequisites (continued)

  • Specific Startup Requirements:

    • Identify ALL SSCs including support systems;

    • Authorization and Safety Basis;

    • Operator Training Requirements Completed;

    • Procedures Finalized (V&V);

    • Test Program Complete, results approved;

    • DSA fully implemented; etc; . . .

Nov 2006


Identify prerequisites continued3

Authorization Agreement

Authorization Basis (AB)

S/RID

EIS

SER

Safety Basis

(SB)

ORR/RA

DSA

(or equivalent)

TSR, HAR, FHA,

BIO, USQ

NESS

Defined Work Scope

Special Terms & Conditions

WSS

PHA

Environmental Permits

Drawings (facility, tooling, etc.)

Technical Manuals

Engineering Calculation Notes

Contractor Safety Programs

Site S&S Plan

Emergency Preparedness Plan

Identify Prerequisites(continued)

Nov 2006