1 / 4

Introduction

Introduction. COP Case for Change: The process of optimizing production in a large offshore gas producing asset in the North Sea is manually intensive and slow to react to changes in the producing system Major impediments to improving the process include:

Download Presentation

Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction • COP Case for Change: • The process of optimizing production in a large offshore gas producing asset in the North Sea is manually intensive and slow to react to changes in the producing system • Major impediments to improving the process include: • The lack of a capability to access an accurate and dynamic model of asset configuration data for use by various engineering applications • The inability to feed real time data to the engineering applications without hard coding system interfaces

  2. Objectives • The PRODML COPPR pilot would demonstrate how PRODML enables the capabilities to: • Create a dynamically updateable network model and make changes available for allocation reporting • Facilitate the access of real time data from the appropriate source system • Capture changes in the asset configuration network model for an audit trail, including rationale behind changes • Utilize a network model to support field operations

  3. Pilot Team Members

  4. Technology Products

More Related