BCCPG

Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability Task Force Wind Integration Forum – Steering Committee November 17 2011. BCCPG. Purpose of Presentation.

varuna
Download Presentation

BCCPG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits)Gordon Dobson-Mack (Chair)Dynamic Transfer Capability Task ForceWind Integration Forum – Steering CommitteeNovember 17 2011 BCCPG

  2. Purpose of Presentation • Discuss the need for TVLs and what can be done to increase them

  3. Outline • Variability & its impacts: • Increased variability is a reality for operations; • Dynamic Transfers contribute to variability; • Transfer Variability impacts the grid; • Need Transfers Variability Limits for some systems. • DTC Task Force • Mandate & Membership; • Deliverables; • What Next? • Questions & Options;

  4. BPA’s Installed Wind Source: BPA: http://transmission.bpa.gov/business/operations/Wind/WIND_InstalledCapacity_Plot.pdf

  5. NWPP Wind Generation Levels 2010 Coincident Peak Load = 60,200 MW Dec 2010 Installed Wind Gen = 7,800 MW Dec 2012 Installed+Committed Wind Gen = 13,200 MW 2010 Spring Min Load (HE04) = 32,745 MW Source: NWPP & DTC TF: http://www.columbiagrid.org/documents-search.cfm search “DTCTFPhaseFullReport031611.pdf”

  6. Source: http://www.westgov.org/EIMcr/meetings/07MAR11/present/panel5/l_beane.pdf see slide #3

  7. Generation or Transmission Problem? • Generation Problem: • Need to maintain Generation Balance; • Want access to least cost & most flexible Ancillary Services • Transmission Problem…As well: • Transmission system designed historically for routine predictable changes; • Must be ready to withstand the next worst contingency; • Voltage control and RAS arming are local measures that must be factored into the solution.

  8. R L R L R L R L C C C C C Transmission Line Physics Load Transmission Line

  9. Reactive “Tuning” And Remedial Action Schemes (RAS) Light Load or line open - High Voltage unless reactive switched off Maximum TTC, Transmission Tuned Low Voltage: Without added Reactive – could Be a voltage collapse

  10. Power - Voltage Curves andReliability N-1 Limits Operating MW Range Caps in Capacitor Switched on Acceptable Voltage Range Operating MW Range no Caps in N-1 Outage Voltage Level N-1 Outage Normal N-0 Reliability Limits MW Power Level

  11. Added Switching Traditional tie line flow 2050 MW Path flow with VG Remedial Action Schemes (RAS) RAS arm RAS un-arm Capacitor In Capacitor Out MW Flow 1850 MW 0 10 20 30 40 50 60 Minutes

  12. DTC Studies-BPA Report (Feb 2010) • Present Dynamic Schedule Requirements • Montana – NW • 50 MW BPA Loads • 20 MW Glacier Wind • 1318 MW Colstrip Participants • 91 MW NWE • Idaho – NW • 200 MW PAC • 60 MW Boardman 14

  13. DTC Task Force – Part of Wind Integration Study Team (WIST) DTC Task Force Convened October 2010 Technical Staff primarily from NW & CA entities ~55 Meetings to date. Purpose: Develop a technical consensus on how to facilitate increased Dynamic Transfers without compromising system reliability BAs & TPs to establish DTC Limits on paths Determine if & how to expand DTC

  14. DTC TF (Phase 3 )Membership Avista: Rich Hydzik BPA: Brian Tuck, RamuRamanathan BCH: Steven Pai, Sanjeet Sanghera, CAISO: Jim Price Gaelectric: Dan Wheeler IPCO: Orlando Ciniglio MSR: Dave Arthur, Ann Fisher NWE: Rikin Shah, Ray Brush PAC: SanmanRokade PGE: Philip Augustin, Don Johnson PSE: Alex Berres, Joe Seabrook TANC: Abbas Abed, Shawn Matchim SMUD: Richard Buckingham WAPA (Folsum): Kirk Sornborger • Powerex: Gordon Dobson-Mack • DTC TF Chair • Tel: 604-891-6004 • Gordon.Dobson-Mack@powerex.com • Columbia Grid: Marv Landauer • Northern Tier: Rich Bayless • NWPP: Don Badley 3

  15. DTC TF Work Process Phase 1 (03/11) Phase 2 (07/11) Phase 3 (11/11)

  16. Three Conditions Restricting Transfer Variability Limits

  17. Caveats for Phase 3 Report • Does not calculate TVLs for particular Paths; • Recommends a methodology; • Leaves limit calculations to Transmission Providers • Does not recommend specific projects • Describes generic projects to enhance TVLs • Leaves specific project recommendations to TPs

  18. Bottom Line – so far • TVL is a real issue; • Impediment to transfer imbalance energy and regulation between BAs; • Will limit where & how the region can integrate wind; • Limits can be raised, but not overnight. • Need for TVLs will vary by system; • Should plan for increased transmission flexibility to manage the increasingly variable flows on grid

  19. Questions for Companies • How automated is your RAS arming? • How much automatic voltage control do you have across your system? • What are the TVLs for your major flowgates? • How will your company manage TVLs? • What capital projects are planned to increase Transmission Flexibility?

  20. Options for increasing TVLs • Modifying some SOL assumptions (e.g. overshedding); • Automating RAS • Automating voltage control • Ensure voltage control equipment is designed for frequent switching (**Detailed TVL studies needed to identify most effective solutions)

  21. Questions?