Naseb energy day
This presentation is the property of its rightful owner.
Sponsored Links
1 / 17

NASEB Energy Day PowerPoint PPT Presentation


  • 65 Views
  • Uploaded on
  • Presentation posted in: General

NASEB Energy Day. Chris Advena Transmission Team Lead March 21 and 22, 2005. NEASB Energy Day. PJM Data Sources PJM OASIS http://oasis.pjm.com/indexmain.html PJM eData https://esuite.pjm.com PJM home page http://www.pjm.com. OASIS. Operational Data. OASIS Main. OASIS Data.

Download Presentation

NASEB Energy Day

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Naseb energy day

NASEB Energy Day

Chris Advena

Transmission Team Lead

March 21 and 22, 2005


Neasb energy day

NEASB Energy Day

  • PJM Data Sources

    • PJM OASIS http://oasis.pjm.com/indexmain.html

    • PJM eDatahttps://esuite.pjm.com

    • PJM home pagehttp://www.pjm.com


Oasis

OASIS

Operational Data


Oasis main

OASIS Main


Oasis data

OASIS Data

  • System Information

  • Transmission Facilities Descriptions

  • Dispatch Rates

  • LMP Prices

  • Pricing Point Calculator

  • Emergency Procedures

  • RTOR Information

  • Additional RTOR Information as of 02/16/2005

  • Quad Cities West Information

  • PJM Coordinated Flowgates as of 01/10/2005

  • Process of Sharing or Transferring Unused Allocations

  • Allocation Results as of 03/01/2005


Oasis data1

OASIS Data

  • System Information

  • Transmission Facilities Descriptions

  • Dispatch Rates

  • LMP Prices

  • Pricing Point Calculator

  • Emergency Procedures

  • RTOR Information

  • Additional RTOR Information as of 02/16/2005

  • Quad Cities West Information

  • PJM Coordinated Flowgates as of 01/10/2005

  • Process of Sharing or Transferring Unused Allocations

  • Allocation Results as of 03/01/2005

  • System Conditions Impacting PJM ATC

  • PJM Transmission Facilities Complete Descriptions

  • PJM Transmission Facilities Outage List

  • PJM Transmission Facilities Outage List new

  • PJM Dispatch Rates (new 15 second interval)

  • PJM Real-Time Operational Data LMP, Transfer Limits, Instantaneous Load, and Transmission Constraints

  • Seven Day PJM Load Projections and Constraint Forecast Information

  • Fixed Transmission Rights (FTRs)


Pjm dispatch rates

PJM Dispatch Rates


Pjm lmp prices and operational data

PJM LMP Prices and Operational Data


Oasis main1

OASIS Main


Pjm manuals reference

PJM Manuals / Reference

  • PJM Tariff

  • CBM Practices - Man. 2: Transmission Service Request

  • Regional Practices / Business Rules

  • OASIS User Guide

  • NERC Tagging - Priority Codes Job Aid

  • OASIS Timing Requirements Job Aid

  • PJM Company Transmission Provider Information

  • Confirmed Reservations as of 03/09/2005


Oasis1

OASIS

Transmission Service


Oasis application login

  • Display ATC

  • Discounts

  • Transaction Information

  • Energy Scheduled

  • Security

  • PJM Info

  • Post/Read Messages

  • Company Information

  • User Information

OASIS Application Login


Oasis transaction information

OASIS Transaction Information


Edata

eData

Real-time Data


Edata1

eData


Edata2

eData


Edata3

eData

  • Preferred Layout

  • My eData

  • Energy Contracts

  • eSuite

  • IRC Report

  • Constraints

  • Activity Log

  • Announcements

  • Emergency Messages


  • Login