L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004. L2TS Pulsar Board (Phase I). TS broadcast L2A/L2R to all front-end crates. Send L2 trigger decision to trigger supervisor. Receive L2 trigger decision from PC. b0xft00. On L2A, receive TL2D bank.

valiant
Download Presentation

L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

  2. L2TS Pulsar Board (Phase I) TS broadcast L2A/L2R to all front-end crates Send L2 trigger decision to trigger supervisor Receive L2 trigger decision from PC b0xft00 On L2A, receive TL2D bank b0cot00 b0fcal05 TS Send TL2D to the DAQ stream upon L2A • Firmware for Phase I summer commissioning has been written (Sakari) • First round of testing shows the firmware is working well • In the process of integrating with the PCs

  3. PCL2TSTS Test Setup • We have setup a mini-DAQ system in the test-stand room. Running algorithm Pulsar TX PC L1 Trigger Data preFRED/ FRED TS L1A (SLINK fiber) Random L1A (SLINK fiber) L2 Trigger Decision + TL2D Bank (Phase I) TS handshaking (sending L2A/R, ROL, Buffer #) L2TS Pulsar

  4. Mini-DAQ (supports 8 test-stand crates) Pulsar (L2TS) RXPT TXPT TS FRED (GL1) preFRED Greg F., Andrew M. , Michael S. and Bill B. did a tremendous job getting the different boards to live happily under one roof.

  5. “Loop” Status • We have achieved the first milestone with the closing of the • “TSPCL2TSTS” loop: • - Still need to test the loop with high rate and larger data size to • look for low level problems • Still need to test the TL2D DAQ path • The next major milestone is to bring Daniel’s control/monitoring node • into the “loop”  closing THE loop. • With “THE” loop fully tested in the test-stand, we’ll be ready for the • trigger room.

  6. Summer Integration Plans (1) While we are still testing “THE” loop in the test-stand, we’ll start replicating in the setup in the trigger room (L2TS and Slink TXs in lower alpha crate, PCs on the 3rd floor). (2) Repeating the same set of test-stand room tests in the trigger room using the real sparky and TS. Can be done in between stores. (3) When the upstream system is ready, we’ll swap the SLINK fiber and send real data into the PC. Proof of principle: use the L2 Pulsar setup for L2 torture and cosmic data runs in between stores. (4) Parasitically running L2 Pulsar in beam (compare alpha TL2D with Pulsar TL2D). In this configuration, L2TS output cable to the TS is dangling. (5) The final step is to plug the L2TS output cable to the trigger room TS in beam run.