Environmental considerations for a sustainable emerald coast
Sponsored Links
This presentation is the property of its rightful owner.
1 / 10

Environmental Considerations for a Sustainable Emerald Coast PowerPoint PPT Presentation


  • 82 Views
  • Uploaded on
  • Presentation posted in: General

Environmental Considerations for a Sustainable Emerald Coast. Darryl Boudreau Assistant Director, Northwest District Florida Department of Environmental Protection [email protected] 232-0276. Agenda. Air Quality Water Quality Waste Disposal FDEP Initiatives.

Download Presentation

Environmental Considerations for a Sustainable Emerald Coast

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Environmental Considerations for a Sustainable Emerald Coast

Darryl Boudreau

Assistant Director, Northwest District

Florida Department of Environmental Protection

[email protected]

232-0276


Agenda

  • Air Quality

  • Water Quality

  • Waste Disposal

  • FDEP Initiatives


Environmental Condition of the Emerald Coast – Air Quality

  • Currently all four counties are in attainment for ambient air quality standards (CO, Lead, NO2, PM10, PM2.5, SOx)

    • Escambia County (5 locations measuring ozone, sulfur dioxide, nitrous dioxide and particulate matter

      • NAS – started in 1980 measures Ozone

      • Warrington Elementary School – started in 1997 measures Ozone

      • Ellyson Industrial Park – started in 1975 measures Ozone, Sulfur Dioxide, Nitrous Oxide, PM10, and PM2.5, Oakcrest Elementary School – collected 2 years of data for PM2.5 , but this monitor is being removed from the network and the data collected will not be used in evaluating attainment status.

      • Frank Reeder Road – collected 2 years of data for PM2.5 , but this monitor is being removed from the network and the data collected will not be used in evaluating attainment status.

    • Santa Rosa County

      • Woodlawn Beach Middle School – started in 2005 measures Ozone (will be adding PM2.5 in 2007)

  • Besides the impact on human health, the net effect of going nonattainment for an air quality standard is the need to develop and implement a “State Implementation Plan” (SIP) for returning the area to attainment which will include stricter regulations and use of more effective pollution control technology.

  • Nonattainment designations are negotiated between the FDEP and EPA but typically range from the county where the violation exits to the MSA of the county where the violation exists. If a standard is lowered to the point where all of the monitors in an area result in violations, then counties/MSAs that do not have monitors would be most likely be included.


Environmental Condition of the Emerald Coast – Air Quality

  • Major pollutants of concern in the Emerald Coast area are Ozone and PM2.5:

    • Ozone – primary causes are NOx, VOCs, Sunlight.

    • PM2.5 – primary causes are NOx, SOx

  • Annual PM2.5 Standard is 15.0 and our 3 year average ending in 2005 is 11.7 and has been relatively stable. (see attachment for more detail)

  • Ozone Design Value is 83 and has remained relatively stable at that level. The Ozone Standard is 85. (see attachment for more detail)

  • The Clean Air Science Advisory Committee is seeking to revise the Ozone standard and if they have their way, Florida as a whole could be non attainment for Ozone depending on what level is actually set. We don’t anticipate the standard being revised for several years.

  • Ozone and PM2.5 appear to be closely related so the solutions will most likely be the same for both


Environmental Condition of the Emerald Coast – Air Quality

  • Effective solutions to each must focus on both the supply and demand side of the equation:

    • Benefit of reducing emissions / kilowatts generated is reduced if at the same time demand for kilowatts increases

    • Can’t reduce the average vehicle miles traveled if public transportation or walking/biking infrastructure is unavailable


Environmental Condition of the Emerald Coast – Air Quality

  • Other successes and further information:

    • Industry emissions

      • Arizona Chemical – Performance Track participant – between 2002 and 2006 hazardous waste was reduced 75%, solid waste reduced 22%, air emissions reduced 67 % and toxic materials in the waste water discharged were reduced 91%.

    • Education – Gulf Coast Ozone Study, Ozone Prediction, Air Now

      • www.dep.state.fl.us/air/publications/techrpt.htm- monitoring network description, annually reported pollutant levels, quick look report, etc.

      • www.dep.state.fl.us/air/airquality.htm- AQI & Forecast, Single Site data, etc.


Environmental Condition of the Emerald Coast – Water Quality

  • *% of total water bodies in the County

  • **Some waters delisted on 303(d) Impaired Waters List with others listed for the first time.

  • *** Habitat Loss due to noted pollution sources and coastal growth is of major concern in all the counties addressed


Environmental Condition of the Emerald Coast – Water Quality

FDEP Actions to address water quality issues

  • Total Maximum Daily Load (TMDL) program (http://www.dep.state.fl.us/water/tmdl/index.htm)

    • .Identify what standards (nutrients, dissolved oxygen, etc.) water bodies are not meeting (impaired),

    • identify how much pollution can the water body absorb and maintain its designated use,

    • through regulatory and non regulatory actions, ensure that the carrying capacity is not exceeded (will likely include both regulated and unregulated sources) – through the implementation of a Basis Management Action Plan (B-MAP).

  • Permitting Innovation.

    • Regional Offsite Mitigation Areas (ROMA)

    • NWD implementing ERP phased over 2 years. Year 1 (2007) stormwater quantity as well as quality (previously was only quality) and year 2 (2008) wetland including isolated wetlands.  Responsibilities will be split between NWFWMD and FDEP depending on type. 

    • Universal Mitigation Assessment Method (UMAM) designed to ensure “functional value” is maintained.

    • Ecosystem Management Agreement – holistic permitting approach that focuses on sustainable development – balancing development plans with environmental needs (St. Joe Development Ecosystem Management Agreement and Bay County Airport relocation)

    • Beneficial Reuse of effluent (IP, Main Street Plant)

  • Habitat Restoration. Developing community partnerships to restore our communities’ natural habitats through our “living shoreline” (restoring saltmarsh, seagrass and oyster reef systems) and riverine/wetland programs – (Project Greenshores, Glynn Key Stormwater Project)


Environmental Condition of the Emerald Coast – Waste Management

  • Clash between waste management facilities (Construction and Demolition and Land Clearing Debris) and residential development.

  • DEP permitting limitations

    • Unable to consider local government zoning

    • Limited to requirements in rule, but push the envelope when able (e.g., cover requirements)

  • Next steps:

    • Solid Waste Rule is currently being modified – continuous 3:1 slopes and some help to require frequent cover C&Ds

    • Evaluate results on H2S assessments

    • County Ordinances to further control siting etc.


Environmental Condition of the Emerald Coast – Other related DEP Initiatives

  • Programs focusing on sustainable development

    • Clean Marina

    • Clean Lodging

    • Pollution Prevention

  • 2007 County Outreach Program


  • Login