T-Wharf Reconstruction Project

T-Wharf Reconstruction Project. Spring Annual Town Meeting Plymouth North High School April 6, 2013. Current Conditions. 2007 Inspection concludes the following: “It is in poor condition” “It does not provide sufficient berthing space for existing users.”

Download Presentation

T-Wharf Reconstruction Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T-Wharf Reconstruction Project Spring Annual Town Meeting Plymouth North High School April 6, 2013

  2. Current Conditions • 2007 Inspection concludes the following: • “It is in poor condition” • “It does not provide sufficient berthing space for existing users.” • “Based on the current poor condition and the need to significantly expand and upgrade the pier facilities, complete replacement is recommended.” • Cost to repair structure is $1.0M to give an additional life of ten years.

  3. Impacts to Wharf Area • No vehicular access • Relocation of fuel from T-Wharf to Town Wharf • Limited pedestrian access • Ongoing temporary repairs to make floats accessible

  4. New Structure • Timber piles with concrete decking • New utilities: Electric, water, stormwater. • Vehicle access • Space for existing and future uses, i.e. aquaculture. • Supports commercial and recreational fishing and tour businesses.

  5. Funding • Federal Economic Development Grant • Massachusetts Bond Bill • Seaport Council • Local Match